Ivanhoe Electric to Release the 2026 Santa Cruz Copper Project Preliminary Feasibility Study Before U.S. Markets Open on September 23, 2026

Go back to Ivanhoe Electric to Release the 2026 Santa Cruz Copper Project Preliminary Feasibility Study Before U.S. Markets Open on September 23, 2026
(NYSE: IE) Delayed: 7.86 -0.03 (0.38%)
Previous Close $7.89    52 Week High $ 
Open $7.75    52 Week Low $ 
Day High $7.96    P/E N/A 
Day Low $7.44    EPS $ 
Volume 2,019,363