Q2 Metals Reports Multiple Wide Intercepts, Including 264.6 Metres at 1.84% Li₂O and 152.9 Metres at 1.59% Li₂O in Drill Hole 71 at the Cisco Lithium Project in Quebec, Canada
Go back to Q2 Metals Reports Multiple Wide Intercepts, Including 264.6 Metres at 1.84% Li₂O and 152.9 Metres at 1.59% Li₂O in Drill Hole 71 at the Cisco Lithium Project in Quebec, Canada| Q2 HOLDINGS, Inc. (NYSE: QTWO) | Delayed: 42.09 -0.76 (1.77%) | |||||
|---|---|---|---|---|---|---|
| Previous Close | $42.85 | 52 Week High | $32.28 | |||
| Open | $43.13 | 52 Week Low | $16.44 | |||
| Day High | $43.13 | P/E | N/A | |||
| Day Low | $40.79 | EPS | $0.00 | |||
| Volume | 655,352 | |||||
| (AMEX: QUEXF) | Delayed: 2.21 -0.06 (2.64%) | |||||
|---|---|---|---|---|---|---|
| Previous Close | $2.27 | 52 Week High | $ | |||
| Open | $2.21 | 52 Week Low | $ | |||
| Day High | $2.21 | P/E | N/A | |||
| Day Low | $2.21 | EPS | $ | |||
| Volume | 1,480 | |||||

