Salazar Reports a High-Grade Tungsten-Silver Intersection at the Pijili Project, Ecuador: 2.00 Metres Grading 1.80% W (2.27% WO3) and 740 g/t Ag
Go back to Salazar Reports a High-Grade Tungsten-Silver Intersection at the Pijili Project, Ecuador: 2.00 Metres Grading 1.80% W (2.27% WO3) and 740 g/t Ag| Salazar Resources Ltd (AMEX: SRLZF) | Delayed: 0.26 -0.01 (3.7%) | |||||
|---|---|---|---|---|---|---|
| Previous Close | $0.27 | 52 Week High | $0.12 | |||
| Open | $0.27 | 52 Week Low | $0.03 | |||
| Day High | $0.27 | P/E | N/A | |||
| Day Low | $0.26 | EPS | $0.00 | |||
| Volume | 6,904 | |||||

