Auro Intersects 496.5m Grading 0.76 g/t Gold and 0.12% Copper, Including 212.5m Grading 1.12 g/t Au and 0.14% Copper at the Santa Barbara Gold-Copper Project, Ecuador

Go back to Auro Intersects 496.5m Grading 0.76 g/t Gold and 0.12% Copper, Including 212.5m Grading 1.12 g/t Au and 0.14% Copper at the Santa Barbara Gold-Copper Project, Ecuador
(AMEX: AURFF) Delayed: 1.25 -0.03 (2.34%)
Previous Close $1.28    52 Week High
Open $1.26    52 Week Low
Day High $1.32    P/E N/A 
Day Low $1.25    EPS
Volume 51,601