Q2 Metals Reports Final Winter Assays with Intercept of 137.6 Metres Grading 1.47% Li₂O, Including 40.6 Metres at 3.25% Li₂O at the Cisco Lithium Project in Quebec, Canada

Go back to Q2 Metals Reports Final Winter Assays with Intercept of 137.6 Metres Grading 1.47% Li₂O, Including 40.6 Metres at 3.25% Li₂O at the Cisco Lithium Project in Quebec, Canada
Q2 HOLDINGS, Inc. (NYSE: QTWO) Delayed: 53.74 +0.88 (1.66%)
Previous Close $52.86    52 Week High $32.28 
Open $53.65    52 Week Low $16.44 
Day High $54.11    P/E N/A 
Day Low $53.00    EPS $0.00 
Volume 412,032       

(AMEX: QUEXF) Delayed: 1.82 +0.01 (0.55%)
Previous Close $1.81    52 Week High
Open $1.80    52 Week Low
Day High $1.82    P/E N/A 
Day Low $1.80    EPS
Volume 26,494