Gold X2 Intersects 86.0m of 1.37 g/t Au from 314.0m at QES During Infill Drilling at the Moss Gold Project

Go back to Gold X2 Intersects 86.0m of 1.37 g/t Au from 314.0m at QES During Infill Drilling at the Moss Gold Project
(AMEX: GSHRF) Delayed: 0.90 -0.02 (2.17%)
Previous Close $0.92    52 Week High
Open $0.90    52 Week Low
Day High $0.90    P/E N/A 
Day Low $0.90    EPS
Volume 3,012