Barksdale Intersects High Grade Porphyry Copper Mineralization, Including Two Intervals of 0.93% Cu and 0.90% Cu over 60.96 Metres Respectively on Flagship Sunnyside Project

Go back to Barksdale Intersects High Grade Porphyry Copper Mineralization, Including Two Intervals of 0.93% Cu and 0.90% Cu over 60.96 Metres Respectively on Flagship Sunnyside Project
(AMEX: BRKCF) Delayed: 0.26 -0.04 (13.33%)
Previous Close $0.30    52 Week High $0.06 
Open $0.26    52 Week Low $0.06 
Day High $0.26    P/E N/A 
Day Low $0.24    EPS $0.00 
Volume 24,441