C3 Metals Intersects 51.1 Metres at 0.54% Copper and 0.31 g/t Gold (0.86% CuEq), Including 18.0 Metres at 1.08% Copper and 0.76 g/t Gold (1.85% CuEq) in Second Drill Hole at Khaleesi Copper Project, P

Go back to C3 Metals Intersects 51.1 Metres at 0.54% Copper and 0.31 g/t Gold (0.86% CuEq), Including 18.0 Metres at 1.08% Copper and 0.76 g/t Gold (1.85% CuEq) in Second Drill Hole at Khaleesi Copper Project, P
(AMEX: CUAUF) Delayed: 0.50 -0.01 (1.96%)
Previous Close $0.51    52 Week High
Open $0.51    52 Week Low
Day High $0.50    P/E N/A 
Day Low $0.50    EPS
Volume 4,083       

Freeport-McMoran Cp & Gld (NYSE: FCX) Delayed: 68.41 +2.07 (3.12%)
Previous Close $66.34    52 Week High $14.26 
Open $67.21    52 Week Low $3.52 
Day High $68.92    P/E 25.91 
Day Low $66.83    EPS $2.64 
Volume 12,603,206