C3 Metals Intersects 51.1 Metres at 0.54% Copper and 0.31 g/t Gold (0.86% CuEq), Including 18.0 Metres at 1.08% Copper and 0.76 g/t Gold (1.85% CuEq) in Second Drill Hole at Khaleesi Copper Project, P

Go back to C3 Metals Intersects 51.1 Metres at 0.54% Copper and 0.31 g/t Gold (0.86% CuEq), Including 18.0 Metres at 1.08% Copper and 0.76 g/t Gold (1.85% CuEq) in Second Drill Hole at Khaleesi Copper Project, P
(AMEX: CUAUF) Delayed: 0.51 -0.01 (1.92%)
Previous Close $0.52    52 Week High
Open $0.51    52 Week Low
Day High $0.51    P/E N/A 
Day Low $0.51    EPS
Volume 10,000       

Freeport-McMoran Cp & Gld (NYSE: FCX) Delayed: 72.73 +0.17 (0.23%)
Previous Close $72.56    52 Week High $14.26 
Open $71.72    52 Week Low $3.52 
Day High $73.29    P/E 27.55 
Day Low $71.45    EPS $2.64 
Volume 7,267,285