DENARIUS METALS ANNOUNCES INITIAL RESULTS FROM ITS 2026 DRILLING CAMPAIGN AT ITS ZANCUDO PROJECT IN COLOMBIA, PROVIDING FURTHER CONFIRMATION OF HIGH-GRADE GOLD AND SILVER MINERALIZATION IN MULTIPLE ST
Highlights
- Multiple high gold and silver grade intercepts were intersected in the first in-fill drill holes completed on the Las
Brisas Target , providing further confirmation of the high-grade nature of the mineralization previously modelled on the Manto Antiguo andSanta Catalina structures. - 7.43 g/t Au and 15 g/t Ag over 1.20 m from 93.8-95.0 m, hole ZM-195,
Santa Catalina , including 28.70 g/t Au and 38 g/t Ag over 0.30 m from 94.3-94.6 m. - 8.36 g/t Au and 1,670 g/t Ag over 1.0 m from 160.3-161.3 m, hole ZM-197, Manto Antiguo, including 27.83 g/t Au and 5,564 g/t Ag over 0.30 m from 160.60-160.90 m.
Las
- The Las
Brisas Target represents an unexploited block within the Manto Antiguo structure preserved by past mining. The in-fill drilling program for the LasBrisas Target has been designed at 50x50 meters drill centers from eight platforms (IF-5 to IF-12) aimed at better delineating and confirming the consistency of mineralization on the two ore-shoots outlined by previous drilling on the Manto Antiguo andSanta Catalina structures, of which the Manto Antiguo ore shoot is controlled by the intersection of the Manto Antiguo andSanta Catalina structures and which usually shows wider and higher-grade intercepts. - The drilling program on the Las
Brisas Target commenced in lateApril 2026 with one drill rig operating from purpose-built surface drill platforms and comprises a total of approximately 6,000 meters of drilling to be carried out in 29 diamond drill holes. The results announced herein have been received from the final assays for the first four drill holes totaling approximately 660 meters carried out from the first purpose-built surface drill platform (IF-7). - The initial drilling was successful in confirming the high-grade gold and silver mineralization in the ore-shoots outlined by previous drilling on the Manto Antiguo structure. All the drill holes completed to date on Manto Antiguo, totaling approximately 560 meters, have intercepted the structure at the estimated depth with maximum intersection grades of 27.83 g/t Au and 5,564 g/t Ag over 0.30 m from 160.60-160.90 m (ZM-197).
- Initial drilling was also successful in confirming the high-grade gold and silver mineralization in the ore-shoot outlined by previous drilling on the Santa Catalina structure. All the drill holes completed to date on
Santa Catalina , totaling approximately 660 meters, have intercepted the structure at the estimated depth with maximum intersection grades of 28.70 g/t Au and 38 g/t Ag over 0.30 m from 94.30-94.60 m (ZM-195).
The following table lists the key sub-intervals from the ongoing Las Brisas in-fill drilling program with grades greater than 4 g/t AuEq cut-off ("Cut-off") associated with main intervals that, in some cases, might not meet the Cut-off:
Year | Target | Hole ID | Structure | From (m) | To (m) | Length (m) | Au (g/t) | Ag (g/t) | AuEq (g/t) | |
2026 | Las Brisas | ZM-195 | 93.8 | 95.0 | 1.2 | 7.43 | 15 | 7.58 | ||
Including | 94.3 | 94.6 | 0.3 | 28.70 | 38 | 29.18 | ||||
Manto Antiguo | 148.3 | 149.1 | 0.8 | 3.57 | 98 | 4.80 | ||||
Including | 148.7 | 149.1 | 0.5 | 5.33 | 98 | 6.56 | ||||
ZM-197 | Manto Antiguo | 160.3 | 161.3 | 1.0 | 8.36 | 1,670 | 29.24 | |||
Including | 160.6 | 160.9 | 0.3 | 27.83 | 5,564 | 97.38 | ||||
Unknown | 167.4 | 168.2 | 0.8 | 2.93 | 10 | 3.10 | ||||
Including | 167.9 | 168.2 | 0.3 | 7.81 | 26 | 8.10 | ||||
ZM-199 | 136.0 | 137.0 | 1.0 | 3.08 | 9 | 3.20 | ||||
Including | 136.6 | 137.0 | 0.4 | 6.32 | 24 | 6.32 | ||||
Manto Antiguo | 161.1 | 162.1 | 1.0 | 1.86 | 2 | 1.86 | ||||
Including | 161.4 | 161.8 | 0.4 | 4.61 | 5 | 4.61 |
Notes:
(1) | The intervals are core lengths. The true widths are estimated to be 80% to 90% of the lengths. |
(2) | Equivalent gold grades (AuEq g/t) were calculated using prices of |
(3) | "Unknown": new structure that doesn't correlate with any of the known structures/veins. |
(4) | Drillhole MT-196 did not have any results above Cut-off for inclusion in the table. |
(5) | Drillhole MT-198 was aborted at shallow surface due to excessive deviation. |
Please refer also to the attached illustrative images 1 to 4 showing the location of the drill holes reported herein from the 2026 drilling campaign along with a sketch of the main structures for the Las
Manto Antiguo and Santa Catalina Structures
The Manto Antiguo structure, which was the main structure mined historically, is interpreted as a WNW-ESE trending brecciated manto structure that merges into the footwall of the Santa Catalina structure. The northerly-trending
2026 Drilling Program
The 2026 drill program comprises a planned total of 15,000 meters on several target areas within the Zancudo Project, including Las Brisas,
Qualified Person
The resource evaluation work was completed by Mr.
Quality Assurance and Quality Control
All the core samples were prepared and assayed for Au by Actlabs Laboratories Ltd (ISO 9001:2015) at their laboratory in Zona Franca Rionegro, Antioquia,
About Denarius Metals
Denarius Metals is a Canadian junior company engaged in the acquisition, exploration, development and eventual operation of precious metals and polymetallic mining projects in high-grade districts in Colombia and Spain. Denarius Metals is listed on Cboe Canada where it trades under the symbol "DMET". The Company also trades on the OTCQX Market in the United States under the symbol "DNRSF".
In Colombia, Denarius Metals is producing gold and silver in an "early production" phase at its 100%-owned Zancudo Project while it completes construction of a 1,000 tonnes per day processing plant that is expected to start producing high-grade gold-silver concentrates by the third quarter of 2026. The Zancudo Project is a high-grade gold-silver deposit, which includes the historic producing Independencia mine, and is located in the Cauca Belt, about 30 km southwest of Medellin.
In Spain, Denarius Metals has interests in three projects focused on in-demand critical minerals. The Company owns a 21.8% interest in Rio Narcea Recursos, S.L. and is the operator of its Aguablanca Project, which has been recognized by the EU as a Strategic Project. The Aguablanca Project comprises a turnkey 5,000 tonnes per day processing plant and the rights to exploit the historic producing Aguablanca nickel-copper mine, located in Monesterio, Extremadura. Denarius Metals also owns a 100% interest in the Lomero Project, a polymetallic deposit located on the Spanish side of the prolific copper rich Iberian Pyrite Belt, approximately 88 km southwest of the Aguablanca Project, and a 100% interest in the Toral Project, a high-grade zinc-lead-silver deposit located in the Leon Province, Northern Spain.
Additional information on Denarius Metals can be found on its website at www.denariusmetals.com and by reviewing its profile on SEDAR+ at www.sedarplus.ca.
Cautionary Statement on Forward-Looking Information
This news release contains "forward-looking information", which may include, but is not limited to, statements with respect to anticipated business plans or strategies, including exploration programs, expected exploration results and mineral resource estimates. Often, but not always, forward-looking statements can be identified by the use of words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", or "believes" or variations (including negative variations) of such words and phrases, or state that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Denarius Metals to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Factors that could cause actual results to differ materially from those anticipated in these forward-looking statements are described under the caption "Risk Factors" in the Company's Annual Information Form dated March 31, 2026 which is available for view on SEDAR+ at www.sedarplus.ca. Forward-looking statements contained herein are made as of the date of this press release and Denarius Metals disclaims, other than as required by law, any obligation to update any forward-looking statements whether as a result of new information, results, future events, circumstances, or if management's estimates or opinions should change, or otherwise. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, the reader is cautioned not to place undue reliance on forward-looking statements.
View original content to download multimedia:https://www.prnewswire.com/news-releases/denarius-metals-announces-initial-results-from-its-2026-drilling-campaign-at-its-zancudo-project-in-colombia-providing-further-confirmation-of-high-grade-gold-and-silver-mineralization-in-multiple-structures-at-the-las-brisas-tar-302818001.html
SOURCE Denarius Metals Corp.
Serious News for Serious Traders! Try StreetInsider.com Premium Free!
You May Also Be Interested In
- THE LEGO GROUP INTRODUCES THE LEGO® SMART PLAY™ GATEWAY AT SAN DIEGO COMIC-CON 2026
- Navatar Launches Claude-Native Deal Engine for Private Equity and M&A Advisory Firms on Salesforce CRM
- Freedom Holding Corp. Works With Ant International’s Antom to Simplify Online Shopping From China for Kazakhstan Consumers
Create E-mail Alert Related Categories
PRNewswire, Press ReleasesRelated Entities
Definitive AgreementSign up for StreetInsider Free!
Receive full access to all new and archived articles, unlimited portfolio tracking, e-mail alerts, custom newswires and RSS feeds - and more!



Tweet
Share


