-
Aztec Minerals Corp. Presents in Existing Agency's Virtual Webinar Series
-
Aztec Drills Oxide Gold & Silver in the Westside Area of the Tombstone Project, Arizona; Intersecting 44.1m of 0.86gpt AuEq (0.22 gpt Au and 44.6 gpt Ag) as Part of a 250m Step Out; And has Joined the
-
Aztec Step-Out Drilling Extends Oxide Au/Ag Zone on Strike to +1km at Tombstone Project, Arizona; Drills 44.1m of 1.16 gpt Au and 77.7 gpt Ag (159.0 gpt AgEq) including 3.04 m of 7.5gpt Au & 465.5 gpt
-
Aztec Drills 48.6m of 133.1 gpt AgEq from Surface at Tombstone Project, Arizona and Expands Drill Program by 3,500m
-
Aztec Drills 40 RC holes at Tombstone Project, Arizona in 2025, Continues to Expand Shallow Silver-Gold Mineralization
-
Aztec Drills 8.14 gpt Gold and 49.67 gpt Silver over 36.5 meters, including 58.5 gpt Gold and 158.0 gpt Silver over 4.6 meters, at the Tombstone Project, Arizona
-
Aztec Minerals Corp. Announces Participation in Red Cloud's 13th Annual Pre-PDAC Mining Showcase
-
Aztec Samples 30.2m of 3.72 gpt Gold and 167.93 gpt Silver (5.82 gpt AuEq) from Ongoing 2024 Surface Exploration Program at Tombstone Gold-Silver Project, Arizona

