Pure DC Completes Europe's First Successful Data Centre Biomethane Proof of Concept
Dublin campus achieves 100% decarbonisation of its natural gas usage
Throughout 2025, all operational natural gas consumption was matched with renewable biomethane, using independently certified gas attributes and recognised Irish and European accounting methodologies. Pure DC utilised Irish Renewable Gas Guarantees of Origin (RGGOs) and European Biomethane Guarantees of Origin (GOs). These certificates were sourced and retired on a megawatt-hour basis to match gas consumption, and met recognised sustainability, traceability, and chain-of-custody requirements, aligned with European renewable gas market practice, EU Emissions Trading Scheme (
The PoC was consistent with Irish policy on data centres and decarbonisation, which prioritises emissions reduction, transparency, and the progressive transition away from unabated fossil fuel use, while recognising the role of renewable gases as a transitional solution where grid-based deployment is constrained in the near term.
The PoC also aligns with
Pure DC acknowledges that renewable gas is a transitional measure rather than an ultimate outcome. Adhering to Irish policy, the company is actively evaluating Irish Biomethane Purchase Agreements (BPA) and ongoing EU biomethane imports to enhance supply reliability and foster development of the local renewable gas market.
Concurrently, Pure DC is advancing longer-term strategies consistent with
DUB01 has been operational since 2024 and supports high-density workloads with cutting-edge cooling and power infrastructure. Located in the fibre-rich Ballycoolin area, the site is designed to deliver 54MW across three data centres: DUB01 (14MW), DUB02 (24MW), DUB03 (16MW). In 2023, we acquired an additional 25 acres west of the site, enabling a future expansion of 90MW, subject to permitting and power.
The campus incorporates sustainable practices, including biochar in landscaping to reduce water usage, and Hydrotreated Vegetable Oil (HVO) for backup and short-term primary power generation. The site includes onsite energy infrastructure designed for 5 nines operational resilience, supported by a 200 MW thermal gas connection. Where feasible, the development allows for future heat export to district heating networks, offering potential benefits to the local community and businesses, as well as opportunity for dispatchable generation capacity to meet resilience and grid support obligations in line with
Notes to editors:
About Pure Data Centres Group: Pure DC builds, and operates data centres across
For more on Pure DC go to www.puredc.com
For media enquiries please contact: [email protected]
View original content:https://www.prnewswire.com/news-releases/pure-dc-completes-europes-first-successful-data-centre-biomethane-proof-of-concept-302713715.html
SOURCE Pure DC
Serious News for Serious Traders! Try StreetInsider.com Premium Free!
You May Also Be Interested In
- Sun Life Appoints Katherine Lee to Board of Directors
- NEUBERGER ENERGY INFRASTRUCTURE AND INCOME FUND ANNOUNCES MONTHLY DISTRIBUTION
- NEUBERGER REAL ESTATE SECURITIES INCOME FUND ANNOUNCES MONTHLY DISTRIBUTION
Create E-mail Alert Related Categories
PRNewswire, Press ReleasesSign up for StreetInsider Free!
Receive full access to all new and archived articles, unlimited portfolio tracking, e-mail alerts, custom newswires and RSS feeds - and more!



Tweet
Share