The drill program significantly improved the team's geological, geotechnical, and metallurgical understanding of the Deposit. The infill and geo-metallurgical holes intersected mineralization and provided excellent data to support a future feasibility study. The drill program also helped to advance permitting efforts at Wildcat and provided valuable insight for future exploration programs. The exploration holes drilled, located ~200m to ~800m outside the main resource area, provide a solid indication of the presence of a potential feeder breccia pipe hidden below post-mineralization basalts. The encouraging geological interpretations from the exploration holes will guide further drilling campaigns aimed at defining the breccia pipe's geometry and potential high-grade zones.
Integra released a Preliminary Economic Assessment ("PEA") for the Nevada North Project (comprised of the Wildcat and Mountain View Deposits) in
The Company will host a webinar on
Highlights
- A total of 3 infill and geo-metallurgical focused holes were drilled as part of the program. Drilling intercepted significant oxide mineralized material, confirming the excellent grade continuity at Wildcat. Drill intercepts within the 2023 PEA pit shell:
- WCCD-0017 returned an intercept of 0.52 grams per tonne ("g/t") oxide Au over 62.5m.
- WCCD-0018 returned an intercept of 0.38 g/t oxide Au over 64.6m.
- WCCD-0019 returned an intercept of 0.27 g/t oxide Au over 147.5m.
- Piezometers were installed in the drill holes to gather important data on the water table elevation at Wildcat. Demonstrating the absence of a pit lake is expected to support a simplified future permitting process.
- A total of 7 highly prospective exploration holes were drilled materially outside the 2023 PEA pit shell and primary mineral resource area:
- Breccia Pipe: 4 holes (totaling ~1,230m) were targeting the high-grade breccia pipe interpreted from geophysics and perceived to be located below post-mineralization basalts (step-out drilling from ~200m to ~800m north of Main Hill area). Although no significant high-grade interval was intercepted, WCCD-0016 returned 0.25 g/t non-oxide Au over 213.8m with pervasive alteration, hydrothermal brecciation, and visible Quartz veins (1-20 centimeters ("cm")). WCCD-0015 intersected lake sediments beneath post-mineralization basalts, potentially indicating that the hole is within the targeted diatreme. This was followed by an intercept of 0.22 g/t non-oxide Au over 12.2m and ended within post-mineralization felsic dykes. These dykes are believed to exploit pre-existing structures that have the potential to carry high-grade gold mineralization.
Rhyolite Ridge : 3 holes (totaling ~310m) were drilled to test grade extensions ~300m east of the 2023 PEA pit. The drilling encountered a thick layer of oxidized brecciated tuff mineralization. While intercepts returned low grades, drilling confirmed the presence of mineralization well outside the PEA main pit, highlighting Wildcat's significant growth potential and the potential to push the pit further to the east.
- Wildcat currently hosts a mineral resource of 746,297 ounces ("oz") Au and 6,437,869 oz of silver ("Ag") or 829,152 oz of gold equivalent ("AuEq") in the Measured and Indicated Category ("M&I") (59,872,806 tonnes at 0.39 g/t Au and 3.34 g/t Ag) and 209,662 oz Au and 1,980,129 oz Ag or 235,146 oz AuEq in the Inferred Category ("Inf.") (22,455,848 tonnes at 0.29 g/t Au and 2.74 g/t Ag).
- The 2023 Nevada North Project (Wildcat and Mountain View deposits) PEA demonstrated strong project economics including an after-tax Net Present Value ("NPV")5% of
US$310 million and a 37% after-tax Internal Rate of Return ("IRR") using base case metal prices ofUS$1,700 /oz Au andUS$21.50 /oz Ag.1 - Using more recent metal prices of
US$2,000 /oz Au andUS$23.00 /oz Ag, the Nevada North Project delivers an after-tax NPV5% ofUS$490 million and a ~54% after-tax IRR.1
- The 2023 Nevada North Project (Wildcat and Mountain View deposits) PEA demonstrated strong project economics including an after-tax Net Present Value ("NPV")5% of
(1) | Refer to the NI 43-101 technical report titled: "Technical Report Preliminary Economic Assessment for the Wildcat and Mountain View Projects, |
Figure 1 – Wildcat Deposit 2024 Drilling Locations:
https://wp-integraresources-2024.s3.ca-central-1.amazonaws.com/media/2024/12/Figure-1-WC-NR-Plan-Figure-2024-12-11.pdf
Figure 2 – Wildcat Deposit Schematic Long Section:
https://wp-integraresources-2024.s3.ca-central-1.amazonaws.com/media/2024/12/Figure-2-WC-NR-Schematic-Long-Section-2024-12-11-2.pdf
Figure 3 – Wildcat Deposit WCCD-0017 Cross Section Looking East:
https://wp-integraresources-2024.s3.ca-central-1.amazonaws.com/media/2024/12/Figure-3-WC-NR-WCCD-0017-Cross-Section-2024-12-11.pdf
Geological Observations
The 2024 drill program at Wildcat had three primary objectives: (1) confirming grade, oxidation continuity, and collecting metallurgical and geotechnical data within the PEA pit, (2) testing conceptual but high-potential exploration targets, including a prospective breccia pipe to the north, and (3) extending oxide mineralization in the
The 2024 drill program successfully validated and enhanced confidence in the existing mineral resource model outlined in the 2023 PEA. Geotechnical-metallurgical drill holes (WCCD-0017, WCCD-0018, and WCCD-0019) were completed within the PEA pit shell, intersecting the expected oxidized tuffaceous breccias and granodiorite units. These holes confirmed the continuity of oxidation and grade within the PEA pit, providing representative material for ongoing metallurgical and geotechnical investigations. Notably, the installation of piezometers in these holes has yielded critical data on water table levels, which will support future hydrogeological studies and permitting efforts by evaluating the potential for pit lake formation. An absence of a pit lake would positively impact permitting timelines and reduce development risk. The geotechnical and metallurgical samples collected during the program will support a future feasibility study and advance the Deposit's progress toward mine development. Assay results from these holes include intercepts of oxide gold mineralization, such as WCCD-0017 returning 0.52 g/t oxide Au over 62.5m (see Figure 3), and WCCD-0019 intersecting 0.27 g/t oxide Au over 147.5m, reinforcing resource continuity. The mineralization observed in these holes exhibits a favorable degree of oxidation, low clay content, minimal fracturing, and strong geotechnical characteristics, all of which are positive indicators for future project development.
The exploration-focused component of the 2024 program was aimed to investigate the high-grade Breccia Pipe targets in the northern area of the Deposit and to evaluate the geologic potential of
At
In summary, the 2024 exploration results provided critical geological markers that reinforce the working hypothesis of a breccia pipe system north of the main Wildcat pit and confirm the continuity of the breccia tuff host rock at
Detailed Drill Results
The following table highlights selected intercepts from the 2024 Wildcat Deposit drill program announced today1,2,3,4,5.
Drill Hole | Location | Oxidation | From | To (m) | Interval (m) | Au |
WCCD-0013 | Breccia Pipe | non-oxide | 132.3 | 146.0 | 13.7 | 0.29 |
WCCD-0014 | Breccia Pipe | oxide | - | 5.2 | 5.2 | 0.21 |
WCCD-0015 | Breccia Pipe | non-oxide | 149.1 | 161.2 | 12.2 | 0.22 |
WCCD-0016 | Breccia Pipe | oxide | 56.1 | 62.4 | 6.3 | 0.17 |
WCCD-0016 | Breccia Pipe | non-oxide | 99.8 | 313.6 | 213.8 | 0.25 |
including | Breccia Pipe | non-oxide | 163.4 | 164.3 | 0.9 | 3.19 |
WCCD-0017 | PEA | oxide | - | 14.0 | 14.0 | 0.13 |
WCCD-0017 | PEA | oxide | 32.9 | 95.4 | 62.5 | 0.52 |
WCCD-0017 | PEA | non-oxide | 95.4 | 136.6 | 41.2 | 0.97 |
including | PEA | non-oxide | 103.3 | 104.6 | 1.2 | 6.65 |
including | PEA | non-oxide | 109.1 | 110.6 | 1.5 | 7.13 |
WCCD-0018 | PEA | oxide | 36.0 | 100.6 | 64.6 | 0.38 |
including | PEA | oxide | 58.8 | 59.4 | 0.6 | 3.16 |
including | PEA | oxide | 64.3 | 65.2 | 0.9 | 5.02 |
WCCD-0019 | PEA | oxide | - | 147.5 | 147.5 | 0.27 |
WCCD-0020 | oxide | 15.9 | 64.6 | 48.8 | 0.14 | |
WCCD-0021 | oxide | 5.2 | 76.1 | 70.9 | 0.14 | |
WCCD-0022 | oxide | 9.8 | 28.0 | 18.3 | 0.18 | |
WCCD-0022 | non-oxide | 28.0 | 44.8 | 16.8 | 0.16 |
(1) | Downhole thickness is true thickness. |
(2) | Intervals reported are uncapped. |
(3) | An economical cut-off of 0.1 g/t was considered during the intersects creation. |
(4) | Certain intervals were not sampled because they were utilized for alternative purposes requiring intact core (i.e. - geotechnical analysis, additional metallurgical tests). These unsampled intervals (~1% of the total program footage) have been replaced by 'zero grade' for the purposes of this news release. |
(5) | Refer to plan view for location names. |
Wildcat Deposit Overview
Wildcat is located within the Farrell mining district in
Wildcat Mineral Resource Estimate
Tonnes | g/t | oz Au | g/t | oz Ag | g/t | oz AuEq | ||
Oxide | Indicated | 59,872,806 | 0.39 | 746,297 | 3.34 | 6,437,869 | 0.43 | 829,152 |
Inferred | 22,455,848 | 0.29 | 209,662 | 2.74 | 1,980,129 | 0.33 | 235,146 |
(1) | Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
(2) | Refer to the NI 43-101 technical report titled: "Technical Report Preliminary Economic Assessment for the Wildcat and Mountain View Projects, |
(3) | The estimate is reported for open-pit mining scenario and with reasonable assumptions. |
(4) | The cut-off grade of 0.15 g/t Au was calculated using a gold price of |
(5) | Rounding as required by reporting guidelines may result in apparent discrepancies between tonnes, grades, and contained metal content. |
(6) | The estimate of mineral resources may be materially affected by geology, environment, permitting, legal, title, taxation, sociopolitical, marketing, or other relevant issues. |
Sampling and QA/QC Procedure
Thorough QA/QC protocols are followed including insertion of duplicate, blank and standard samples in the assay stream for all drill holes. The samples are submitted directly to American Assay Labs in
Qualified Person
The scientific and technical information contained in this news release has been reviewed and approved by Raphael Dutaut, Ph.D (
About Integra Resources
Integra is a growing precious metals producer in the
ON BEHALF OF THE BOARD OF DIRECTORS
Jason Kosec
President, CEO and Director
Forward Looking and Other Cautionary Statements
Certain information set forth in this news release contains "forward‐looking statements" and "forward‐looking information" within the meaning of applicable Canadian securities legislation and applicable
Forward-looking statements are often identified by the use of words such as "may", "will", "could", "would", "anticipate", "believe", "expect", "intend", "potential", "estimate", "budget", "scheduled", "plans", "planned", "forecasts", "goals" and similar expressions. Forward-looking statements are based on a number of factors and assumptions made by management and considered reasonable at the time such information is provided. Assumptions and factors include: the Company's ability to complete its planned exploration programs; the absence of adverse conditions at mineral properties; no unforeseen operational delays; no material delays in obtaining necessary permits; the price of gold remaining at levels that render mineral properties economic; the Company's ability to continue raising necessary capital to finance operations; and the ability to realize on the mineral resource and reserve estimates. Forward‐looking statements necessarily involve known and unknown risks and uncertainties, which may cause actual performance and financial results in future periods to differ materially from any projections of future performance or result expressed or implied by such forward‐looking statements. These risks and uncertainties include, but are not limited to: integration risks; general business, economic and competitive uncertainties; the actual results of current and future exploration activities; conclusions of economic evaluations; meeting various expected cost estimates; benefits of certain technology usage; changes in project parameters and/or economic assessments as plans continue to be refined; future prices of metals; possible variations of mineral grade or recovery rates; the risk that actual costs may exceed estimated costs; geological, mining and exploration technical problems; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); title to properties; and management's ability to anticipate and manage the foregoing factors and risks. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in the forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Readers are advised to study and consider risk factors disclosed in Integra's annual report on Form 20-F dated
There can be no assurance that forward‐looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward‐looking statements if circumstances or management's estimates or opinions should change except as required by applicable securities laws. The forward-looking statements contained herein are presented for the purposes of assisting investors in understanding the Company's plans, objectives and goals, and may not be appropriate for other purposes. Forward-looking statements are not guarantees of future performance and the reader is cautioned not to place undue reliance on forward‐looking statements.
Cautionary Note for U.S. Investors Concerning Mineral Resources and Reserves
NI 43-101 is a rule of the Canadian Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Technical disclosure contained in this news release has been prepared in accordance with NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Classification System. These standards differ from the requirements of the U.S. Securities and Exchange Commission ("SEC") and resource information contained in this news release may not be comparable to similar information disclosed by domestic
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
View original content to download multimedia:https://www.prnewswire.com/news-releases/integra-provides-overview-of-2024-drill-program-at-wildcat-deposit-in-nevada-302329687.html
SOURCE Integra Resources Corp.
Serious News for Serious Traders! Try StreetInsider.com Premium Free!
You May Also Be Interested In
- Faraday Future raises annual robot shipment target to 2,000 units
- BC.GAME Showcases Its Crypto-First iGaming Ecosystem at iGB L!VE 2026
- EU panel backs Hopledo for Parkinson's motor fluctuations
Create E-mail Alert Related Categories
PRNewswire, Press ReleasesRelated Entities
S3, EarningsSign up for StreetInsider Free!
Receive full access to all new and archived articles, unlimited portfolio tracking, e-mail alerts, custom newswires and RSS feeds - and more!



Tweet
Share