Hycroft Extends High-Grade Silver at Brimstone
542.78 g/t silver over 35.5 meters
Including 1187.29 g/t silver over 14.8m and 21,833 g/t silver over 0.4m
358.15 g/t silver over 11.2 meters
Including 662.03 g/t silver over 5.8m 7,330 g/t silver over 0.3m
See video interview with
Drilling Highlights: (See appendix for full drill results and accompanying figures)
- Confirmed the Brimstone silver system extends approximately 150 meters deeper than previously identified and remains open at depth and in lateral extensions (see Figures 1 and 3)
- Encountered the presence of strong mineralized fluid pathways and stockwork veining commonly associated with the high-grade Brimstone system (see Figure 3)
- Step-out drilling expanded the known area of high-grade silver mineralization (see Figure 2)
- Confirmed the structural model interpretation of the high-grade system
Table 1. Drill Intercept Highlights (See Table 2 for all drill results)
| Hole ID | FROM | TO | INTERVAL | GRADE | |||
(meters) | (meters) | (meters) | Ag (g/t) | Au (g/t) | AgEQ (g/t) | AuEQ (g/t) | |
Brimstone | |||||||
H25D-6069 | 270.1 | 302.5 | 32.4 | 184.58 | 0.33 | 212.68 | 2.47 |
Including | 285.0 | 289.2 | 4.2 | 1,185.25 | 0.98 | 1,269.48 | 14.74 |
H25D-6077 | 313.0 | 348.6 | 35.5 | 542.78 | 0.25 | 564.64 | 6.56 |
Including | 326.8 | 341.6 | 14.8 | 1,187.29 | 0.19 | 1,203.61 | 13.98 |
Also Including | 340.2 | 340.6 | 0.4 | 21,833.00 | 0.07 | 21,839.03 | 253.61 |
Brimstone Geophysics Anomaly | |||||||
H25D-6074 | 581.1 | 588.7 | 7.6 | 24.86 | 0.05 | 29.17 | 0.34 |
H25D-6075 | 505.5 | 516.8 | 11.2 | 358.15 | 0.09 | 365.51 | 4.24 |
Including | 505.5 | 511.3 | 5.8 | 662.03 | 0.12 | 672.03 | 7.80 |
Also Including | 511.0 | 511.3 | 0.3 | 7,330.00 | 0.76 | 7,395.44 | 85.88 |
Drill holes 6074, 6075, and 6075X were completed within the Induced Polarization ("IP") geophysics anomaly to test the down-dip extension of the Brimstone high-grade silver system targeting the fluid pathway and stockwork veining. The holes were drilled in a zone between the east-west trending structures (MD_AD and Nicholes faults) in close proximity to the IP anomaly. All three holes showed strong geochemical signatures, silver mineralization, and stockwork veining consistent with the high-grade silver mineralization observed at the Brimstone system. Results confirm Brimstone remains open at depth and laterally."
The farthest step out hole, H25D-6075, drilled approximately 150 meters down-dip from the high-grade Brimstone system, returned 11.2 meters of 385.15 g/t silver, confirming the extension of high-grade mineralization at depth. Holes H25D-6074 and H25D-6075X (wedge / directional drilling hole of H25D-6075) also returned anomalous silver grades and displayed alteration and geochemical markers commonly associated with alteration from a magmatic intrusion indicating we are still in an intermediate sulfidation system. This is consistent with the high-grade Brimstone geochemistry and alteration package observed to date.
Drilling is continuing to test the deeper portions of the Brimstone system including the potential feeder target. In addition, the lateral extents of the Brimstone system remain open. These ongoing efforts are intended to further define and scale the continuity of the Brimstone system.
A total of 11 holes were completed in 2025 (7 in Brimstone and 4 in Vortex) and all assays have been received with the exception of one Vortex hole that is pending. To date in the 2026 drill program, 6 core holes have been completed (4 in Brimstone and 2 in Vortex) with assays pending. There is currently one core rig at Brimstone and one core rig at Vortex with two additional core rigs arriving over the next few months.
About Hycroft Mining Holding Corporation
Hycroft Mining Holding Corporation is a US-based gold and silver company exploring and developing the
For further information, please contact:
E: [email protected]
www.hycroftmining.com
Cautionary Note Regarding Forward-Looking Statements
This press release contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, Section 21E of the Securities Exchange Act of 1934, as amended, and the Private Securities Litigation Reform Act of 1995. All statements, other than statements of historical fact, included in this press release and in public statements by our officers or representatives that address activities, events or developments that we expect or anticipate will or may occur in the future are forward-looking statements. These include, but are not limited to, statements regarding future business strategy, plans and goals, competitive strengths, the advancement and development of the
Forward-looking statements are often identified by future or conditional words such as "estimate," "plan," "anticipate," "expect," "intend," "believe," "target," "budget," "may," "can," "will," "would," "could," "should," "seeks," "scheduled to" and similar words or expressions but the absence of these words does not mean that a statement is not forward-looking. Forward-looking statements are based on current expectations, estimates and projections that involve a number of risks and uncertainties, which could cause actual results to differ materially from those reflected in the statements. The risks include, but are not limited to: (i) risks related to changes in our operations at the
Any exploration target described in this press release does not represent, and should not be construed to be, an estimate of a mineral resource or mineral reserve. Ranges of potential tonnage and grade (or quality) of an exploration target are conceptual in nature; there has been insufficient exploration of the relevant property or properties to estimate a mineral resource; and it is uncertain if further exploration will result in the estimation of a mineral resource.
These and other risks may cause actual results to differ materially from those expressed or implied by the forward-looking statements, and the occurrence of one or more of these events or circumstances, alone or in combination with others, may have a material adverse effect on our business, cash flows, financial condition and results of operations. Please see the "Risk Factors" outlined in our Annual Report on Form 10-K for the year ended
Given these risks and uncertainties, you are cautioned not to place undue reliance on these forward-looking statements. Although we have attempted to identify important factors that could cause actual results to differ materially from those described in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. Although these forward-looking statements are based on assumptions that we believe are reasonable when made, forward-looking statements are not guarantees of future performance and actual results, performance or achievements may differ materially from those made in or suggested by the forward-looking statements in this press release.
Any forward-looking statements made in this press release speak only as of the date of this press release. We undertake no obligation to update these forward-looking statements or to publicly announce the results of any revisions to any of those statements to reflect future events or developments, except as required by law.
APPENDIX
Table 2 – Full Drill Results
| Hole ID | FROM | TO | INTERVAL | GRADE | |||
(meters) | (meters) | (meters) | Ag (g/t) | Au (g/t) | AgEQ (g/t) | AuEQ (g/t) | |
Brimstone | |||||||
H25D-6069 | 56.7 | 69.2 | 12.5 | 81.39 | 0.13 | 92.58 | 1.08 |
H25D-6069 | 109.6 | 125.4 | 15.8 | 6.09 | 0.59 | 56.90 | 0.66 |
H25D-6069 | 164.9 | 305.8 | 140.9 | 49.63 | 0.28 | 73.74 | 0.86 |
Including | 270.1 | 302.5 | 32.4 | 184.58 | 0.33 | 212.68 | 2.47 |
Also Including | 285.0 | 289.2 | 4.2 | 1,185.25 | 0.98 | 1,269.48 | 14.74 |
H25D-6077 | 127.1 | 148.4 | 21.3 | 5.76 | 0.49 | 47.95 | 0.56 |
H25D-6077 | 190.2 | 211.2 | 20.9 | 4.60 | 0.34 | 33.88 | 0.39 |
H25D-6077 | 232.7 | 349.6 | 116.9 | 167.84 | 0.28 | 191.95 | 2.23 |
Including | 313.0 | 348.6 | 35.5 | 542.78 | 0.25 | 564.64 | 6.56 |
Also Including | 326.8 | 341.6 | 14.8 | 1,187.29 | 0.19 | 1,203.61 | 13.98 |
Also Including | 340.2 | 340.6 | 0.4 | 21,833.00 | 0.07 | 21,839.03 | 253.61 |
Brimstone Geophysics Anomaly | |||||||
H25D-6074 | 85.8 | 153.9 | 68.0 | 7.73 | 0.23 | 27.54 | 0.32 |
H25D-6074 | 244.8 | 261.3 | 16.5 | 5.35 | 0.39 | 38.93 | 0.45 |
H25D-6074 | 485.2 | 508.3 | 23.1 | 3.29 | 0.28 | 27.40 | 0.32 |
H25D-6074 | 581.1 | 588.7 | 7.6 | 24.86 | 0.05 | 29.17 | 0.34 |
H25D-6075 | 5.8 | 105.6 | 99.8 | 7.16 | 0.21 | 25.24 | 0.29 |
H25D-6075 | 505.5 | 516.8 | 11.2 | 358.15 | 0.09 | 365.51 | 4.24 |
Including | 505.5 | 511.3 | 5.8 | 662.03 | 0.12 | 672.03 | 7.80 |
Also Including | 511.0 | 511.3 | 0.3 | 7,330.00 | 0.76 | 7,395.44 | 85.88 |
H25D-6075X | 568.0 | 591.5 | 23.5 | 6.81 | 0.11 | 15.89 | 0.18 |
View original content to download multimedia:https://www.prnewswire.com/news-releases/hycroft-extends-high-grade-silver-at-brimstone-302715032.html
SOURCE Hycroft Mining Holding Corporation




