Close

Form 6-K SEABRIDGE GOLD INC For: Mar 01

March 1, 2022 7:45 AM EST

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER
THE SECURITIES EXCHANGE ACT OF 1934

For the month of March 2022

Commission File Number 1-32135

SEABRIDGE GOLD INC.
(Name of Registrant)

106 Front Street East, Suite 400, Toronto, Ontario, Canada M5A 1E1
(Address of Principal Executive Office)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

Form 20-F [   ]          Form 40-F [X]

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): [   ]

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): [   ]

Indicate by check mark whether by furnishing the information contained in this Form, the registrant is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.

Yes[   ]         No [X]

If "Yes" is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): 82- _______________


SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

  Seabridge Gold Inc.
  (Registrant)
     
  By:  /s/ Chris Reynolds
  Name: Chris Reynolds
  Title: VP Finance and CFO
     
     
     
Date: March 1, 2022  


EXHIBITS

Exhibit Description
  
99.1   News Release dated March 1, 2022



News Release

Trading Symbols: TSX: SEA

For Immediate Release

  NYSE: SA March 1, 2022

Seabridge Gold Enters into Agreement with BC Hydro

to Supply Green, Low-Cost Construction Power to KSM Project

Toronto, Canada... Seabridge Gold's wholly owned subsidiary, KSM Mining ULC ("KSM Mining"), has signed a Facilities Agreement (the "Agreement") with British Columbia Hydro and Power Authority ("BC Hydro") covering the design and construction of facilities by BC Hydro to supply construction phase hydro-sourced electricity to the KSM project.

KSM will connect to BC Hydro's existing Northwest Transmission Line ("NTL") at BC Hydro's Treaty Creek Switching Station ("TCT"). This TCT, located where KSM's Treaty Creek access road meets Highway 37, south of Bell 2, is scheduled to be completed before the end of 2024. KSM Mining has completed its design for a 30 km long 287 KV transmission line to interconnect the TCT and the KSM plant site. This KSM transmission line is scheduled to be constructed in 2023 with completion and commissioning planned for late 2024 to be ready for connection to the TCT.

Previous studies at KSM originally incorporated diesel power for construction activities, with hydro power to be supplied later from BC Hydro's NTL for operations. Connecting to BC Hydro's NTL earlier than previously planned provides a number of significant ESG and economic advantages including:

(i) green hydro power will replace significant diesel generation over the multi-year construction phase, with a corresponding large reduction in greenhouse gas emissions;

(ii) Hydro power is less than 25 percent of the cost of diesel-generated power with consequent capital and operating cost savings;

(iii) the TCT and transmission line will eventually be required for operations and moving this infrastructure forward in the project schedule de-risks construction; and

(iv) the installation is part of our work towards "Substantially Started". Achieving substantially started designation will ensure that KSM's Environmental Assessment Certificate remains in place for the life of the project.

Seabridge Chairman and CEO Rudi Fronk stated, "We are delighted to take our relationship with BC Hydro to the next level. Having access to low-cost hydro power is one of many logistical advantages KSM enjoys compared to other large undeveloped gold and copper projects around the world. The recently announced US$225 million funding from Sprott Resource Streaming and Royalty Corp. and Ontario Teachers' Pension Plan provides the capital necessary for our work with BC Hydro as well as our other substantially started activities."


The cost of the new BC Hydro switching station consists of $28.9 million in cash payments for facilities directly required by the KSM Project and $54.2 million in security (or cash in lieu) for BC Hydro system reinforcement as required to make the power available. The system reinforcement security will be forgiven annually, typically over a period of less than 8 years, based on project power consumption.

Seabridge holds a 100% interest in several North American gold projects. Seabridge's assets include the KSM and Iskut projects located near Stewart, British Columbia, Canada, the Courageous Lake project located in Canada's Northwest Territories, the Snowstorm project in the Getchell Gold Belt of Northern Nevada and the 3 Aces project set in the Yukon Territory. For a full breakdown of Seabridge's mineral reserves and mineral resources by category please visit the Company's website at http://www.seabridgegold.com.

None of the Toronto Stock Exchange, New York Stock Exchange, or their Regulation Services Providers accepts responsibility for the adequacy or accuracy of this release.

All reserve and resource estimates reported by the Corporation were calculated in accordance with the Canadian National Instrument 43-101 and the Canadian Institute of Mining and Metallurgy Classification system. These standards differ significantly from the requirements of the U.S. Securities and Exchange Commission. Mineral resources which are not mineral reserves do not have demonstrated economic viability.

This news release includes certain forward-looking statements or information. All statements other than statements of historical fact included in this release, including, without limitation, statements regarding: (i) the schedule for completing the TCT; (ii) the schedule for completing and commissioning the KSM transmission line; (iii) the anticipated completion of the announced financing from Sprott; and (iv) the forgiving of system reinforcement security, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's plans or expectations include unexpected delays in construction activities, including difficult site conditions, unusual weather or pandemic-related shutdowns or worker shortages at the Project, availability of capital and financing, general economic, market or business conditions, timeliness of government or regulatory approvals and other risks detailed herein and from time to time in the filings made by the Company with securities regulators. The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise except as otherwise required by applicable securities legislation.

  ON BEHALF OF THE BOARD
  "Rudi Fronk"
  Chairman & C.E.O.

For further information please contact:

Rudi P. Fronk, Chairman and C.E.O.

Tel: (416) 367-9292  Fax: (416) 367-2711

Email: [email protected]




Serious News for Serious Traders! Try StreetInsider.com Premium Free!

You May Also Be Interested In





Related Categories

SEC Filings