Close

Form 6-K AGNICO EAGLE MINES LTD For: Oct 31

October 31, 2014 8:12 AM EDT

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

Form�6-K

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE
SECURITIES EXCHANGE ACT OF 1934

For the month: October, 2014

Commission File Number

AGNICO EAGLE MINES LIMITED

(Translation of registrant�s name into English)

145 King Street East, Suite�400, Toronto, Ontario M5C 2Y7

(Address of principal executive office)

Indicate by check mark whether the registrant files or will file annual reports under cover of Form�20-F or Form�40-F. Form 20-F�o Form�40-F�x

Indicate by check mark if the registrant is submitting the Form�6-K in paper as permitted by Regulation S-T Rule�101 (b)( 1): o

Note: Regulation S-T Rule�101 (b)( 1) only permits the submission in paper of a Form�6-K if submitted solely to provide an attached annual report to security holders.

Indicate by check mark if the registrant is submitting the Form�6-K in paper as permitted by Regulation S-T Rule�101 (b)(7): o

Note: Regulation S-T Rule�101(b)(7)�only permits the submission in paper of a Form�6-K if submitted to furnish a report or other document that the registrant foreign private issuer must furnish and make public under the laws of the jurisdiction in which the registrant is incorporated, domiciled or legally organized (the registrant�s �home country�), or under the rules�of the home country exchange on which the registrant�s securities are traded, as long as the report or other document is not a press release, is not required to be and has not been distributed to the registrant�s security holders, and, if discussing a material event, has already been the subject of a Form�6-K submission or other Commission filing on EDGAR.

Indicate by check mark whether the registrant by furnishing the information contained in this Form�is also thereby furnishing the information to the Commission pursuant to Rule�12g3-2(b)�under the Securities Exchange Act of 1934. Yes�o���No�x

If �Yes� is marked, indicate below the file number assigned to the registrant in connection with Rule�12g3-2(b): 82-����� ������������.



EXHIBITS

Exhibit�No.

Exhibit�Description

99.1

Press Release dated October�29, 2014 announcing the Corporation�s Third Quarter 2014 Results.

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

AGNICO EAGLE MINES LIMITED

�������������(Registrant)

Date: October�31, 2014

By:

/s/ R. Gregory Laing

R. Gregory Laing

General Counsel,�Sr. Vice-President, Legal

and Corporate Secretary

2


Exhibit 99.1

Stock Symbol:

AEM (NYSE and TSX)

For further information:

Investor Relations

(416) 947-1212

(All amounts expressed in U.S. dollars unless otherwise noted)

AGNICO EAGLE REPORTS THIRD QUARTER 2014 RESULTS �

2014 GOLD PRODUCTION EXPECTED TO EXCEED TOP END OF FORECAST,

2015 GUIDANCE INCREASED ON THE BACK OF STRONG OPERATING PERFORMANCE

Toronto (October�29, 2014) � Agnico Eagle Mines Limited (NYSE:AEM, TSX: AEM) (�Agnico Eagle� or the �Company�) today reported a quarterly net loss of $15.1 million, or a net loss of $0.07 per share for the third quarter of 2014.� This result includes a non-cash foreign currency translation loss on deferred tax liabilities of $11.3 million ($0.05 per share), other non-recurring losses of $4.9 million ($0.02 per share), various mark-to-market adjustment losses of $4.3 million ($0.02 per share), non-cash stock option expense of $3.5 million ($0.02 per share) and non-cash foreign currency translation gains of $4.7 million ($0.02 per share).� Excluding these items would result in an adjusted net income of $4.2 million, or $0.02 per share.� In the third quarter of 2013, the Company reported net income of $74.9 million, or $0.43 per share.

Earnings during the quarter were affected by: additional amortization expenses resulting from the increase in the net book value of depreciable assets under International Financial Reporting Standards (�IFRS�); increased exploration expenses at the new Amaruq project and at the Canadian Malartic Partnership; and lower realized gold prices on timing of sales (approximately 3% lower than the average London PM gold fix for the quarter).

The Company adopted IFRS as of July�1, 2014 and all financial results herein, including those for prior periods, have been calculated in accordance with IFRS.

For the first nine months of 2014, the Company reported net income of $104.3 million, or $0.55 per share.� This compares with the first nine months of 2013 when net income was $93.6 million, or $0.54 per share.� Financial results in the 2014 period were positively affected by significantly higher gold production (1,041,753 ounces as opposed to 776,892 ounces) due primarily to higher grades at Meadowbank, the acquisition of Canadian Malartic and contributions from commercial production at Goldex and La India.

Third quarter 2014 cash provided by operating activities was $71.2 million ($129.2 million before changes in non-cash components of working capital), compared to cash provided

1



by operating activities of $88.4 million in the third quarter of 2013 ($176.1 million before changes in non-cash components of working capital).

For the first nine months of 2014, cash provided by operating activities was $504.4 million ($472.8 million before changes in non-cash components of working capital), as compared with the first nine months of 2013 when cash provided by operating activities was $340.3 million ($415.2 million before changes in non-cash components of working capital).

The higher net income and cash provided by operating activities in the first nine months of 2014 was in spite of lower realized metal prices and is a result of significantly higher gold production, as described above.

�In 2014, we have strengthened our businesses in each of our four principal operating regions, and we anticipate continued strong production performance in the fourth quarter of 2014 and for 2015 as a number of our key mines continue to expand and ramp up their output.� As such, we are pleased to provide increased production guidance of approximately 1.6 million ounces for 2015�, said Sean Boyd, President and Chief Executive Officer.� �With the pending closure of the Cayden acquisition and a maiden resource expected at Amaruq by early next year, Agnico is well positioned to drive further growth on both our Northern and Southern business platforms well into the future�, added Mr.�Boyd.

Third quarter 2014 highlights include:

����������������� Continued strong operating performance in the third quarter 2014 � Payable production1�of 349,273 ounces at total cash costs2�per ounce on a by-product basis of $716

����������������� Canadian Malartic mine achieves record quarterly mill throughput and productivity � Mill processes an average of 52,539 tonnes per day (�tpd�) with cost per tonne below budget and top end of 2014 production guidance expected to be achieved


1�Payable production of a mineral means the quantity of mineral produced during a period contained in products that are sold by the Company whether such products are shipped during the period or held as inventory at the end of the period.

2�Total cash costs per ounce is a Non-GAAP measure.� For a reconciliation to production costs, see �Reconciliation of Non-GAAP Financial Performance Measures � Reconciliation of Production Costs to Total Cash Costs per Ounce of Gold Produced by Mine� below.� Total cash costs per ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product metal revenues). Total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the consolidated statements of income (loss) for by-product revenues, unsold concentrate inventory production costs, smelting, refining and marketing charges and other adjustments, and then dividing by the number of ounces of gold produced. Total cash costs per ounce of gold produced on a co-product basis is calculated in the same manner as total cash costs per ounce of gold produced on a by-product basis except that no adjustment for by-product metal revenues is made. See �Note Regarding Certain Measures of Performance�. For information about the Company�s total cash costs per ounce on a co-product basis please see �Reconciliation of Non-GAAP Performance Measures�.

2



����������������� Upper end of 2014 guidance projected to be exceeded � Production for 2014 is expected to be approximately 1.4 million ounces with total cash costs on a by-product basis of $650 to $675 per ounce

����������������� Updated 2015 guidance � Production for 2015 is now expected to be approximately 1.6 million ounces as a result of expected increased production at Meadowbank, Kittila and the Mexican operations

����������������� Initial resource expected at Amaruq project by early 2015 � 31,400 metre drill program completed in October�2014, final assays are being compiled, resource estimation in progress

����������������� Cayden acquisition receives overwhelming securityholder approval � Acquisition expected to be completed by late 2014 or early 2015 pending Mexican regulatory approval. A $15 million exploration program has been proposed for 2015 after the acquisition closes

����������������� Conversion to IFRS completed � 2013 and 2014 financials have been restated to reflect the conversion

Payable gold production in the third quarter of 2014 was 349,273 ounces (including 64,761 ounces from the Canadian Malartic mine) compared to 315,828 ounces (including 1,505 ounces of pre-commercial production from Goldex) in the third quarter of 2013.� A description of the production and cost performance for each mine is set out below.

Total cash costs per ounce of gold produced on a by-product basis for the third quarter of 2014 were $716.� This compares with $591 per ounce on a by-product basis in the third quarter of 2013.� The higher cash costs per ounce in the 2014 period were due primarily to lower production of gold at Meadowbank with the completion of mining in the higher grade Goose Pit, scheduled and unscheduled shutdowns at the LaRonde mill to upgrade the production and service hoist drives, and a two week tie-in shutdown for the mill expansion at Kittila.

Payable gold production for the first nine months of 2014 was 1,041,753 ounces (including 76,639 ounces from the Canadian Malartic mine) compared to payable gold production of 776,892 ounces (including 8,801 ounces of production from Kittila, Creston Mascota, and Goldex that were not included in the total cash cost calculation) in the comparable 2013 period.

For the first nine months of 2014, total cash costs on a by-product basis were $627 per ounce.� This compares with total cash costs of $659 per ounce on a by-product basis in the first nine months of 2013.� The higher production and lower total cash costs in 2014 are due to a strong first half contribution (higher production and lower costs) from Meadowbank and reflects contributions from Goldex, La India and Canadian Malartic.

3



Strong Operational Performance Across all Regions Drives Increased Production Guidance for 2014 and 2015

Over the course of 2014, the Company has strengthened its businesses in all four of its� principal operating regions, which has resulted in an increase to both the 2014 and 2015 production guidance.

In the Abitibi region, the LaRonde, Goldex, and Canadian Malartic mines are positioned for improved operating performance moving through 2014 and beyond.� The upgrading of the hoist drives at LaRonde in the third quarter of 2014 provides the mine better access to the higher grade, deeper portions of the orebody, which is expected to drive higher future production rates, anticipated to exceed 300,000 ounces per year by mid-2016.

At Goldex, lower than expected operating costs has allowed for the potential development of other satellite orebodies, which is expected to enhance the production profile and reduce costs.� Development of an exploration ramp into the Deep zone is being advanced to facilitate drilling to delineate mineable reserves by late 2015 or early 2016.� Given the strong operational performance achieved to date, the Goldex mining approach may also open up other mining opportunities in the Abitibi region.

At the Canadian Malartic mine, record quarterly mill and mine throughput levels have led to lower than expected costs and 2014 production is now forecast to come in at the higher end of the guidance range of 510,000 to 530,000 ounces (on a 100% basis). Ongoing optimization efforts are expected to result in further production and cost improvements in 2015.

The tie-in of the Kittila plant expansion led to lower than expected production in the third quarter of 2014.� Production in the fourth quarter is expected to return to more normal levels, and the plant expansion (to approximately 4,000 tpd) is expected to result in increased production levels starting next year.� Ramp development in the Rimpi zone is expected to provide future feed to the mill and enhance Kittila�s production profile.

Given its strong mill and mine performance, Meadowbank is on track for a record production year in 2014.� These operating efficiencies are expected to continue to drive strong production in 2015 as well. Impressive exploration results from an expanded 2014 exploration program at the new Amaruq discovery (approximately 50 km from the mine) appears to have the potential to extend the current Meadowbank mine life. A maiden resource is expected in early 2015 (just over a year from the time of the initial discovery at Amaruq) and studies are currently underway to evaluate how Amaruq can be incorporated into the Meadowbank mine plan with possible synergies to the Meliadine project.

The securityholders of Cayden Resources Inc. (�Cayden�) voted 99.0% in favour of the plan of arrangement under which Agnico Eagle would acquire Cayden.� On the closing of this acquisition Agnico Eagle will gain access to the El Barque�o property in Jalisco State, Mexico.� The Company believes that this property has the potential to develop into a significant production asset, which could drive additional growth on the Southern

4



Business platform.� Once Cayden is acquired, the Company expects to commence exploration activities at El Barque�o with a budget of $15 million proposed for 2015.

Given the strong operating results over the first nine months, the 2014 production forecast has been increased for a second time and is now expected to be approximately 1.4 million ounces, exceeding the previously announced second quarter 2014 guidance range of 1.35 to 1.37 million ounces, while total cash costs on a by-product basis are expected to remain in the range of $650 to $675 per ounce.� Expected all-in sustaining cost3� (�AISC�) guidance calculated on a by-product basis for 2014 is unchanged at $990 per ounce.

Given the favorable developments in the Company�s four principal operating regions, production for 2015 is now expected to be approximately 1.6 million ounces as a result of increased production forecasts at Meadowbank, Kittila and the Mexican operations.� Prior 2015 guidance (see the news release dated February�12, 2014) was 1.25 million ounces (excluding Canadian Malartic).� Detailed guidance for 2015, 2016 and 2017 will be included in Agnico Eagle�s regular three-year guidance news release to be provided in February�2015.

Quarterly Dividend Declared

The Board of Directors has approved the next quarterly dividend of 8 cents per share to be paid on December�15, 2014 to shareholders of record as of December�1, 2014.� Agnico Eagle has paid a dividend every year since 1983.

Conversion to International Financial Reporting Standards

Effective as of the third quarter 2014, the Company converted its basis of accounting from US GAAP to IFRS with a transition date of January�1, 2013. Agnico Eagle is now reporting under IFRS for interim and annual periods, with comparative information restated under IFRS. Additional disclosure regarding the IFRS conversion will be included in the Company�s Management�s Discussion and Analysis in respect of the third quarter of 2014, which is expected to be filed in November�2014.

As a result of the conversion to IFRS, the Company�s cost base for property, plant and equipment has been adjusted.� For new depreciable asset balances by mine, see the financial statements at the back of this news release.


3� All-in sustaining costs is a Non-GAAP measure and is used to show the full cost of gold production from current operations. The Company calculates all-in sustaining costs per ounce of gold produced as the aggregate of total cash costs on a by-product basis, sustaining capital expenditures (including capitalized exploration), general and administrative expenses (including stock options) and reclamation expenses divided by the amount of gold produced.� The Company�s methodology for calculating all-in sustaining costs may not be similar to the methodology used by other producers that disclose all-in sustaining costs. See �Note Regarding Certain Measures of Performance�.� The Company may change the methodology it uses to calculate all-in sustaining costs in the future, including in response to the adoption of formal industry guidance regarding this measure by the World Gold Council.

5



The measurement of deferred taxes under IFRS differs from US GAAP such that additional deferred tax expense in the amount of $10.3 million was recognized in the third quarter of 2014 due to the weakening of the Mexican peso and Euro relative to the US dollar during this period.� The Company�s expected overall tax rate for 2014 remains at 35% to 40%.

Cayden Resources Acquisition � Securityholders Approve Transaction, Mexican Regulatory Approval Pending

Securityholders of Cayden have overwhelmingly approved the acquisition by Agnico Eagle of all of the outstanding shares of Cayden.� Mexican regulatory approval is pending and the Company expects to complete the transaction by late 2014 or early 2015.

The maximum number of shares issuable by Agnico Eagle for the acquisition of Cayden will be approximately 4.86 million, or approximately 2.3% of Agnico Eagle�s outstanding shares (on a fully-diluted basis).

Cayden owns, has options to acquire or has staked, concessions constituting a 100% interest in the El Barqueo property, which covers approximately 41,000 hectares in the Guachinango gold district in Jalisco State, Mexico. El Barqueo hosts a significant epithermal bonanza type gold vein and disseminated stockwork system. Several gold bearing zones have been identified by drilling and trenching in an area approximately 13.5 km long by 4.7 km wide.

Cayden also owns a 100% interest in the Morelos Sur property, which covers approximately 13,000 hectares in the Guerrero gold belt in Guerrero State, Mexico. Morelos Sur consists of three properties (La Magnetita, Tenantla and Las Calles) and exploration by Cayden has outlined a 25 km2�gold soil anomaly at La Magnetita, and Tenantla.

The Cayden acquisition is consistent with Agnico Eagle�s long-term strategy of acquiring early stage projects where the Company believes it can add further value through focused exploration and mine building.� A $15 million exploration budget has been proposed for the El Barqueo property in 2015.

Third Quarter 2014 Results Conference Call and Webcast Tomorrow

Agnico Eagle�s senior management will host a conference call on Thursday, October�30, 2014 at 11:00 AM (E.D.T.) to discuss the Company�s financial and operating results.

Via Webcast:

A live audio webcast of the meeting will be available on the Company�s website www.agnicoeagle.com.

Via Telephone:

For those preferring to listen in by telephone, please dial 416-847-6330 or Toll-free 1-866-530-1553. To ensure your participation, please call approximately five minutes prior to the scheduled start of the call.

6



Replay Archive:

Please dial 647-436-0148 or Toll-free 1-888-203-1112, access code 9653906. The conference call replay will expire on November�30, 2014 at 2:00 PM (E.S.T.).

The webcast along with presentation slides will be archived for 180 days on www.agnicoeagle.com.

Capital Expenditures

Capital expenditures in the third quarter of 2014 were $125.4 million, including $29.2 million at Kittila, $19.0 million at Meadowbank, $18.5 million at LaRonde, $14.0 million at Pinos Altos, $6.5 million at Goldex, $5.0 million at Lapa, $4.8 million at La India and $1.4 million at Creston Mascota.� Capital expenditures at development projects included $10.8 million at Meliadine.

On a 100% basis, capital expenditures at the Canadian Malartic mine in the third quarter of 2014 were C$39.2 million (approximately C$106.3 million for the first nine months of 2014).

Capital expenditures for the first nine months of 2014 were $342.1 million.� For 2014, capital expenditures are expected to total approximately $499 million, representing a $31 million increase from the previously announced figure of $468 million which is due primarily to the capitalization of deferred stripping expenses as a result of the conversion of the Company�s accounting basis from US GAAP to IFRS and additional expenditures at Goldex to accelerate the exploration ramp development into the top of the deeper D zone.

LiquidityPositive Amendments to Revolving Credit Facility

Cash and cash equivalents and short-term investments totaled $165.6 million at September�30, 2014, down from the June�30, 2014 balance of $265.4 million.� The decrease in the cash balance is largely due to expenditures related to the seasonal sealift program at Meadowbank and the partial repayment of the Company�s bank credit facility (the �Credit Facility�).� The outstanding balance on the Credit Facility was $500 million at September�30, 2014 which decreased from the June�30, 2014 balance of $520 million. Available bank lines as of September�30, 2014 are approximately $700 million.

Agnico Eagle�s share of the debt obligations associated with the Canadian Malartic GP (the �Partnership�), which operates the Canadian Malartic mine, are now consolidated on the Company�s balance sheet.

As at September�30, 2014, the Partnership (on a 100% basis) had C$46.3 million of cash and cash equivalents, C$122.4 million in long-term debt, C$75 million of convertible debentures and C$78.9 million of capital lease obligations.

7



In addition to the Credit Facility, the Company�s debt has five separate series of notes outstanding, with maturities spread out over a seven-year period, with the earliest maturity of $115 million due in 2017.

On September�8, 2014, the Company amended the Credit Facility to extend the maturity date from June�22, 2017 to June�22, 2019 and improved the pricing terms.

Northern Business Operating Review

LaRonde � Hoist Upgrade Complete, Q4 Production to Increase Significantly

The 100% owned LaRonde mine in northwestern Quebec, Canada, began operation in 1988.� Current mine life is estimated to be through 2025.

The LaRonde mill processed an average of 4,634 tpd in the third quarter of 2014, compared to an average of 5,946 tpd in the corresponding quarter of 2013.� The lower mill throughput in the current period was largely the result of a planned three week shutdown in July�to upgrade the production and service hoist drives at the Penna shaft, and an unscheduled five day shutdown due to an electrical issue with the service hoist drive discovered during the commissioning phase.

During the shutdowns, adjustments were made to the mining sequence in the third quarter of 2014.� As a result, less ore was mined from the deeper portion of the LaRonde mine with more ore coming from upper level stopes, which had lower gold grades.

With the hoist drive upgrade complete, production is expected to return to more normal levels (approximately 55,000 to 60,000 ounces) in the fourth quarter of 2014.� Production is also expected to benefit from the mining of higher grade ore as the Level 293 pyramid advances to maturity. The mined gold grade (3.10 grams per tonne, year-to-date) is expected to continue to increase towards the average reserve grade (5.0 grams per tonne) over the next several years.

Minesite costs per tonne4�were approximately C$111 in the third quarter of 2014 compared to C$107 per tonne in the third quarter of 2013.� The higher cost in the 2014 period is largely due to lower throughput related to the shutdowns described above.

For the first nine months of 2014, the LaRonde mill processed an average of 5,668 tpd, compared to 6,228 tpd in the first nine months of 2013.� Minesite costs per tonne were approximately C$100, compared to C$102 per tonne in the first nine months of 2013. Costs were lower primarily due to reduced labour costs, and lower material costs (electricity and consumables), which more than offset the impact of the shutdowns in the third quarter of 2014.


4�Minesite costs per tonne is a Non-GAAP measure.� For reconciliation to production costs, see �Reconciliation of Non-GAAP Financial Performance Measures � Reconciliation of Production Costs to Minesite Costs per Tonne by Mine� contained herein.� See also �Note Regarding Certain Measures of Performance�.

8



On a per ounce basis, LaRonde�s total cash costs per ounce were $861 on a by-product basis in the third quarter of 2014 on production of 37,490 ounces of gold.� This compares with the third quarter of 2013 when total cash costs per ounce were $772 on a by-product basis on production of 45,253 ounces of gold.� The decreased production in the third quarter of 2014 is due to lower mill throughput that resulted from the shutdowns which also resulted in an increase of total cash costs per ounce. In addition, there was also less by-product (silver and zinc) revenue in the third quarter of 2014 compared to the third quarter of 2013, as a result of lower quantities produced and a reduction in the realized price of silver, offset in part by an increase in the price of zinc.

In the first nine months of 2014, LaRonde produced 145,336 ounces of gold at total cash costs per ounce of $701 on a by-product basis.� This is in contrast with the first nine months of 2013 when the mine produced 130,445 ounces of gold at total cash costs per ounce of $812 on a by-product basis.� The higher production is due to the proportion of higher grade ore being mined from the deeper portion of the mine which has been increasing towards the average reserve grade.� The lower total cash costs in 2014 are largely related to increased gold production. An approximate increase of 19.7% in gold grade, period over period, more than offset the impact of the 2014 shutdowns.

After 2014, LaRonde is expected to increase production to an average life of mine production of more than 300,000 ounces of gold per year, reflecting the higher gold grades expected at depth.

Installation of a coarse ore conveyor system, which will extend from the 293 level to the crusher on the 280 level, remains on schedule and budget for start-up in the second half of 2015.� The new conveyor is expected to minimize the impact on trucking capacity and reduce congestion in the deeper portions of the mine.� Studies are also underway to investigate the potential to define reserves and carry out mining activities below a depth of 3.1 km (the current lower limit of the LaRonde reserve base).

Canadian Malartic General Partnership � Quarterly Records for Mill Throughput and Mine Productivity

In June�2014, Agnico Eagle and Yamana Gold Inc. (�Yamana�) acquired all issued and outstanding common shares of Osisko Mining Corporation, and created the 50:50 Partnership that owns and operates the Canadian Malartic mine in northwestern Quebec through a joint management committee.

During the third quarter of 2014, the Canadian Malartic mill (on a 100% basis) processed an average of 52,539 tpd, which was a new quarterly record.� Minesite costs per tonne were lower than budget at approximately C$19.60 (excluding royalties) as throughput improves and optimization efforts continue. The third quarter included a five day scheduled shutdown for mill maintenance.� The average stripping ratio was 2.6 to 1.0.

For the first nine months of 2014, the Canadian Malartic (on a 100% basis) mill processed an average of 50,580 tpd, with minesite costs per tonne of approximately C$20 (excluding royalties).� Minesite costs per tonne have been better than the guidance

9



of C$21 per tonne (excluding royalties) that was issued on July�30, 2014, largely due to better productivity.

For the third quarter of 2014, production at the Canadian Malartic mine (on a 100% basis) was 129,521 ounces of gold at a total cash cost per ounce of $735 on a by-product basis.

In the first nine months of 2014, the Canadian Malartic mine produced 402,732 ounces of gold (on a 100% basis).� Canadian Malartic�s total cash costs per ounce were $650 on a by-product basis in the first nine months of 2014. Given the strong operational performance this quarter, it is expected that gold production (on a 100% basis) will be near the upper end of the guidance forecast range of 510,000 ounces to 530,000 ounces for the full year 2014.

Since acquiring its interest in the Canadian Malartic mine on June�16, 2014, Agnico Eagle�s share of production is 76,639 ounces at a total cash cost per ounce of $717 on a by-product basis.

The Partnership filed a NI 43-101 report on the Canadian Malartic mine on August�13, 2014 (for details please see the news release dated August�13, 2014).

In Agnico Eagle�s second quarter news release, total capital costs for 2014 at the Canadian Malartic mine (on a 100% basis) were estimated at approximately C$169.3 million.� Capital costs are now expected to be reduced to approximately C$154.6 million.� The change is largely due to optimization of the Gouldie pit and minor deferrals into 2015.

Canadian Malartic Mine Optimization Update � Several Initiatives are Underway

The Partnership is looking at a variety of ways to optimize operations at the Canadian Malartic mine.� The current crushing circuit has a nameplate capacity of 55,000 tpd.� Although this rate has been exceeded on a daily basis and monthly basis, throughput levels are forecast to be 51,000 to 52,000 tpd for the next six to twelve months, with a ramp up to full capacity of 55,000 tpd over a one to two year timeframe.� Various options are being evaluated to reach the design capacity.

Ounce reconciliation with the block model continues to be positive (3% to 4% higher), and could have a favourable impact on the quantity of gold produced going forward.

Near-term productivity improvements include:

����������������� Using a loader to manage the stockpile and keep the crusher full at all times, which has also led to improved haul truck cycle times

����������������� Ongoing optimization of the blasting pattern with the objective of producing finer material to feed into the crushing and grinding circuit

10



����������������� Progressive reduction in the use of blasting mats through 2015 (localized use will continue post 2015)

During the third quarter, the following programs or studies were initiated:

����������������� Creation of a productivity/continuous improvement team with a focus on reducing operating costs

����������������� Evaluating the potential to convert to LNG fueled trucks, which are cheaper to operate and have lower greenhouse gas emissions

����������������� Renegotiation of major contracts on fuel and consumables (evaluating potential synergies with other Agnico Eagle Abitibi operations)

����������������� Program to review manpower requirements (including contractors)

����������������� Optimization of the maintenance program for mobile equipment

����������������� Optimization of liner wear in all major crushing components

����������������� Looking at possible modification of the SAG mill liner design to increase the grinding efficiency and expected liner life

����������������� Potential to use larger grinding media in the SAG mill

����������������� Initiation of projects to reduce consumables consumption

����������������� Optimization of waste rock management plans with an aim of trying to reduce cycle times

����������������� Optimization of the life-of-mine plan

During the third quarter of 2014, the Partnership completed the transition and optimization of the previous Osisko head office in Montreal including relocating to a smaller administration office which is expected to result in annual savings of approximately C$25 to C$30 million. The Partnership is also committed to empowering its workforce to reduce/optimize costs at all levels of the organization.

Additional details on the optimization plan, and updated three year guidance will be provided with Agnico Eagle�s year-end 2014 results in February�2015.

Exploration Activities � $8.0 million Budget Approved Through Year-End 2014

In addition to being joint operators at the Canadian Malartic mine, Agnico Eagle and Yamana are also jointly exploring a portfolio of properties in the Kirkland Lake area, and the Pandora and Wood-Pandora properties in the Abitibi region of Quebec.

Subsequent to a review of exploration work carried out earlier this year, approximately $8.0 million (on a 100% basis) has been allocated towards exploration through the balance of 2014, with a focus on the Upper Beaver project in Kirkland Lake, and the Pandora property.� Activities will include the compilation of historical work at the various Kirkland Lake properties and the initiation of a technical report on the Upper

11



Beaver project.� Exploration expenditures in the third quarter of 2014 were approximately $2.8 million (on a 100% basis).

Work at Upper Beaver will focus on testing for near surface mineralization.� In addition, several drill holes are planned to test for mineralization below the current intercepts that encountered high-grade intervals at depths below 1,500 metres.� A technical report is expected to be completed by the end of 2014 that will evaluate the mineral potential and form the basis for a Preliminary Economic Assessment, which is expected to be completed in 2015.

At Pandora, drilling will evaluate the near surface North Branch zone, and several drill holes will also be drilled from the 101-W Exploration drift at the adjacent Lapa mine to test for mineralization at the South Branch target.

Underground drilling to test the South Branch target on the jointly owned Pandora property is currently underway from the 101�W drift.� This drift may be extended onto the Pandora property depending on the success of the drill program.

Lapa � Strong Mill Performance and Continued Cost Containment

The 100% owned Lapa mine in northwestern Quebec achieved commercial production in May�2009.� Current mine life is estimated to be through 2016.

The Lapa circuit at the LaRonde mill processed an average of 1,703 tpd in the third quarter of 2014, slightly higher than the 1,675 tpd processed in the third quarter of 2013.

Minesite costs per tonne were C$104 in the third quarter of 2014, compared to C$112 in the third quarter of 2013.� Despite mining at a deeper depth, the lower minesite costs in the current quarter are due to ongoing cost containment (including using less cemented backfill and ventilation automation), lower labor costs and better mine development performance versus the comparable period last year.

For the first nine months of 2014, the Lapa mill processed an average of 1,747 tpd, compared to 1,732 tpd in the first nine months of 2013.� Minesite costs per tonne were approximately C$106, below the C$112 per tonne in the first nine months of 2013 for the same reasons explained above.

Payable production in the third quarter of 2014 was 24,781 ounces of gold at total cash costs per ounce of $606 on a by-product basis.� This compares with the third quarter of 2013, when production was 24,361 ounces of gold at total cash cost per ounce of $686 on a by-product basis.� In the current period, the slight increase in gold production and lower total cash costs per ounce were generally due to slightly increased throughput levels, the processing of higher gold grades and lower minesite costs per tonne compared to the same quarter last year.

In the first nine months of 2014, Lapa produced 67,011 ounces of gold at total cash costs per ounce of $689 on a by-product basis.� This compares to the first nine months of 2013

12



when the mine produced 74,407 ounces of gold at total cash costs per ounce of $696 on a by-product basis.� The lower production in the 2014 period is primarily due to the processing of lower grades compared to the same period last year.

Development of the Zulapa Zone 7 (approximately 100 metres into the hangingwall of the main Lapa mining zone) is ahead of schedule with the first stope planned for Q4 2014 (about one quarter ahead of schedule).� Development of the nearby Zulapa Zone 8 is also being prioritized.

Goldex Mine � Low Cost Operation Continues to Ramp Up, New Satellite Zones Under Development

The 100% owned Goldex mine in northwestern Quebec began operation in 2008 but mining operations in the Goldex Extension Zone (GEZ) orebody were indefinitely suspended in October�2011.� Mining operations at the GEZ remain suspended. In July�2012, the M and E satellite zones were approved for development and these zones achieved commercial production in October�2013.

The Goldex mill processed an average of 5,851 tpd in the third quarter of 2014 and throughput is expected to increase to approximately 6,000 tpd by year end 2014. Minesite costs per tonne at Goldex were approximately C$32 in the third quarter of 2014.

For the first nine months of 2014, the Goldex mill processed an average of 5,647 tpd. Minesite costs per tonne were approximately C$33. Minesite costs per tonne have been significantly lower than 2014 guidance of C$37, primarily due to improved underground productivity, reduced labor costs and lower cement content in the paste backfill.

Payable gold production in the third quarter of 2014 was 27,611 ounces at a total cash cost per ounce of $582 on a by-product basis. In the first nine months of 2014, Goldex produced 70,970 ounces of gold at total cash costs per ounce of $661 on a by-product basis.

Development activities are continuing on the M2, M5 and E2 satellite zones. A new surface portal has been collared and approximately 50% of the pre-existing ramp has been refurbished to provide access to the M3 and M4 zones.

The Company is evaluating the potential to accelerate development of the exploration ramp into the DX zone (the top of the Deep zone). This ramp is designed to provide access for additional exploration drilling, with a goal of outlining a mineable reserve and the completion of a technical study by late 2015 or early 2016.

Development of the Deep zone would have the potential to further extend the mine�s life. Economies of scale may also be available if additional zones are developed as the mill has the ability to operate at over 8,000 tpd.� Given the strong operational performance achieved to date, the Goldex mining approach may also open up other mining opportunities in the Abitibi region.

13



Meadowbank � Lower Grade Mining Sequence Partially Offset by Strong Mill Performance

The 100% owned Meadowbank mine is located in Nunavut, Canada.� Current mine life is estimated to be through 2017.

The Meadowbank mill processed an average of 11,492 tpd in the third quarter of 2014.� This compares with 11,379 tpd in the third quarter of 2013.� The slight increase in the 2014 period is largely due to the continued optimization of the mine plan and improved equipment availability.

Minesite costs per tonne were C$74 in the third quarter of 2014, compared with C$81 per tonne in the third quarter of 2013.� Costs were lower in the 2014 period due to higher throughput in 2014 versus 2013, ongoing cost reduction initiatives, better fuel management and the positive currency impact from the weakening of the Canadian dollar.

For the first nine months of 2014, the Meadowbank mill processed an average of 11,365 tpd, compared to 11,334 tpd in the first nine months of 2013.� Minesite costs per tonne were approximately C$73 in the first nine months of 2014, below the C$78 per tonne in the comparable 2013 period for the same reasons described above.

Payable production in the third quarter of 2014 was 91,557 ounces of gold at total cash costs per ounce of $777 on a by-product basis.� This compares with payable production in the third quarter of 2013 of 133,489 ounces of gold at total cash costs per ounce of $610 on a by-product basis.� The decrease in year-over-year production and higher total cash costs is due to the expected decrease in the grade (approximately 31%) compared to the previous period resulting from the mining sequence.

In the first nine months of 2014, Meadowbank produced 366,162 ounces of gold at total cash costs per ounce of $561 on a by-product basis.� In the first nine months of 2013 the mine produced 307,180 ounces of gold at total cash costs per ounce of $761 on a by-product basis.� The stronger 2014 results are due to the mining of higher grade ore in the Goose pit during first half of 2014, slightly better recoveries and considerably lower minesite costs per tonne.

Gold production in the fourth quarter is expected to be in line with the third quarter of 2014, while production in 2015 is expected to significantly exceed prior guidance (375,000 ounces as presented in the news release of February�12, 2014) due to the expectation of a strong grade cycle in the Portage pit.

Amaruq Project � Maiden Resource Expected in Early 2015

Exploration at the Amaruq project in September�and October�focused on drilling the Whale Tail gold zone which was discovered in Summer 2014. The $9-million exploration program (144 drill holes totaling 31,623 metres) concluded in mid-October. This represents a significant increase from the $1.5-million program initially budgeted, due to

14



the impressive results obtained from geophysics, field work and drilling as the year progressed.� Exploration expenditures during the quarter were $7.4 million.

Assay results have been received for more than 95% of this year�s drilling, with the rest expected in early November.� The 100%-owned Amaruq property is approximately 50 km northwest of the Meadowbank mine in Nunavut, and was last reported on in a news release dated September�29, 2014.� The latest drill intercepts are expected to be included in a news release scheduled for November.

Work is already underway on an initial Amaruq mineral resource estimate, which is anticipated in early 2015.� The current plan is to re-open the Amaruq exploration camp in late February�2015 and begin a winter drilling program in March, completing the camp expansion to accommodate 60 personnel by late March. Permitting and preliminary engineering activities continue for the possible construction of an all-weather exploration road linking the Amaruq exploration site to the Meadowbank mine for the transport of fuel, equipment and personnel.

Given the size and scope of the discovery, studies are currently underway to evaluate how Amaruq might be incorporated into the Meadowbank operational plan and possibly linked with the Meliadine project.

Kittila Mine � Mill Expansion Essentially Complete, Stronger Q4 Production Expected

The 100% owned Kittila mine in northern Finland achieved commercial production in May�2009.� Current mine life is estimated to be through 2036.

In the third quarter of 2014, the Kittila mill processed an average of approximately 2,559 tpd. This compares with 3,341 tpd in the third quarter of 2013.� The planned mill shutdown in September�to tie-in the expansion was the primary reason for the lower throughput in the 2014 period.

Minesite costs per tonne at Kittila were approximately �86 in the third quarter of 2014, compared to �71 in the third quarter of 2013. The increase in minesite costs per tonne is largely due to the above mentioned shutdown.

For the first nine months of 2014, the Kittila mill processed an average of 2,895 tpd, compared to 2,293 tpd in the first nine months of 2013.� The lower throughput in the 2013 period is primarily due to the 77 day shutdown related to the autoclave relining in the second quarter.

Minesite costs per tonne at Kittila were approximately �79 in the first nine months of 2014 and were �74 in the first nine months of 2013.� Costs over the two periods are not considered comparable given that minesite costs per tonne in the 2013 period do not include the 77 day shutdown related to the autoclave relining in the second quarter.

15



Third quarter 2014 gold production at Kittila was 28,230 ounces with a total cash cost per ounce of $951 on a by-product basis. In the third quarter of 2013 the mine produced 56,177 ounces at total cash costs per ounce of $518. Gold production and costs in the 2014 period were adversely affected by the September�mill shutdown, and the mining of lower grades.� In addition, gold recoveries in the 2014 period were slightly below normal due to temporary site water balance issues.� Recoveries had returned to more normal levels before the September�shutdown.

In the first nine months of 2014, Kittila produced 98,612 ounces of gold at a total cash cost per ounce of $861 on a by-product basis.� This is in contrast to the first nine months of 2013, when the mine produced 104,711 ounces of gold (including 5,389 ounces of production that were not included in the total cash cost calculation), at total cash costs per ounce of $564 on a by-product basis.� The higher cash costs and lower production in the 2014 period are mainly due to the reasons outlined above.

All major tie-ins related to the previously announced Kittila mill expansion have essentially been completed. The expansion has provided upgrades to both the grinding and flotation circuits and the oxidation and cyanidation circuits.

As reported in the second quarter 2014 news release, the expansion capacity was increased, which is expected to enable the Kittila mill to process over 4,000 tpd.� In order to utilize this increased capacity, the Company is looking at a combination of increased mine throughput and the processing of surface stockpiles.� As part of the program to increase mine throughput, a priority focus will be on developing the Rimpi zone through a ramp system to provide sufficient future feed to the mill and enhance Kittila�s production profile.

The higher plant throughput is expected to result in increased gold production in 2015 compared to guidance issued on February�12, 2014.

Meliadine � 2014 Project Activities Remain on Schedule and Budget

Located near Rankin Inlet, Nunavut, Canada, the Meliadine project was acquired in July�2010, and is one of Agnico Eagle�s largest gold projects in terms of reserves and resources. Underground development, exploration drilling, technical studies and permitting have continued in the third quarter of 2014.

In the first nine months of 2014, 148 exploration and conversion drill holes totaling 36,547 metres were completed.� Year-to-date, the exploration ramp has been extended in length by 789 metres, and remains on track to reach the targeted depth of 225 metres by year-end.� Recent drill results are expected to expand gold resources at the Pump, Wesmeg/Normeg and Wolf deposits. An updated technical study is expected in early 2015. For additional details on this project, readers are referred to Agnico Eagle�s mid-year exploration news release dated July�30, 2014.

Final public hearings for Meliadine were successfully completed in late August�2014, with the Nunavut Impact Review Board (�NIRB�) granting conditional approval of the project.

16



Southern Business Operating Review

Pinos Altos � Record Daily Mill Throughput in September

The 100% owned Pinos Altos mine in northern Mexico achieved commercial production in November�2009.� Current mine life is estimated to be through 2025.

The Pinos Altos mill processed an average of 5,040 tpd in the third quarter of 2014, compared to 5,458 tpd per day processed in the third quarter of 2013.� Mill throughput in the 2014 period was lower due to an unplanned shutdown in July�related to the replacement of the SAG mill transformer.� Following the repair, mill throughput in September�was a new monthly record at 5,769 tpd.

During the third quarter of 2014, approximately 143,500 tonnes of ore were stacked on the heap leach at Pinos Altos, compared to 158,800 tonnes in the comparable 2013 period.

Minesite costs per tonne were $48 in the third quarter of 2014, compared to $45 per tonne in the third quarter of 2013.� Minesite costs per tonne at Pinos Altos are affected by normal operating variances in the proportion of heap leach to mill ore, the proportion of underground ore to open pit ore, variations in the proportion of waste to ore mined and variations in the currency exchange rate.

For the first nine months of 2014, the Pinos Altos mill processed an average of 5,311 tpd, compared to 5,244 tpd processed in the first nine months of 2013.� Approximately 436,800 tonnes of ore were stacked on the Pinos Altos leach pad during the first nine months of 2014, compared to 620,900 tonnes in the prior year period.� Minesite costs per tonne were approximately $48 compared to $42 per tonne in the first nine months of 2013 with variance due to the factors mentioned above.

Payable production in the third quarter of 2014 was 41,155 ounces of gold at a total cash cost per ounce of $545 on a by-product basis.� This compares with production of 43,736 ounces at a total cash cost per ounce of $396 on a by-product basis in the third quarter of 2013.� Production in the 2014 period was lower than the comparable 2013 period primarily due to the unplanned shutdown mentioned above.� The higher total cash costs in the 2014 period are primarily due to the shutdown and lower by-product credits.

In the first nine months of 2014, Pinos Altos produced 130,350 ounces of gold at total cash costs per ounce of $513 on a by-product basis.� This is in contrast to the first nine months of 2013 when the mine produced 135,283 ounces of gold at total cash costs per ounce of $348 on a by-product basis.� The higher cash costs in the 2014 period are primarily due to lower silver production and lower realized silver prices in the first quarter of 2014 compared to the first quarter of 2013.

Shaft sinking activities at Pinos Altos continued during the quarter and remain on budget.� The first phase of sinking, which involved slashing into a piloted raisebore hole, was

17



completed to the 23 level during the quarter. The shaft is currently excavated to a depth of 416 metres, and the ultimate shaft depth is currently expected to be 793 metres.� The shaft project will allow better matching of the mill capacity with the future mining capacity at Pinos Altos when the open pit mining operation begins to wind down as planned in the next several years.

Creston Mascota � New Agglomerator and Overland Conveyors Lead to Increased Throughput

The Creston Mascota heap leach has been operating as a satellite operation to the Pinos Altos mine since late 2010.

Approximately 469,200 tonnes of ore were stacked on the Creston Mascota leach pad during the third quarter of 2014, compared to approximately 334,600 tonnes stacked in the third quarter of 2013.� The new agglomerator and overland conveyors were in full operation in the third quarter of 2014, resulting in approximately a 25% increase in throughput.

Minesite costs per tonne at Creston Mascota were $17 in the third quarter of 2014, compared to $19 in the third quarter of 2013. Costs were lower in the 2014 period primarily due to increased productivity as noted above.

For the first nine months of 2014, approximately 1,242,900 tonnes of ore were stacked on the Creston Mascota leach pad, compared to 950,700 tonnes in the prior year period.� Stacking resumed at Creston Mascota in April�2013, following the suspension of activities on the Phase one leach pad in October�2012.

For the first nine months of 2014, mine site costs per tonne at Creston Mascota were $17, unchanged from the $17 per tonne recorded in the first nine months of 2013.

Payable gold production at Creston Mascota in the third quarter of 2014 was 13,377 ounces at a total cash cost per ounce of $556 on a by-product basis.� This compares to 11,307 ounces at a total cash cost per ounce of $545 on a by-product basis during the third quarter of 2013.� The higher production in the 2014 period is a result of more tonnes stacked, while the slightly higher cash costs are due to higher consumables costs and an increase in parts inventory.

Payable gold production for the first nine months of 2014 was 34,853 ounces at a total cash cost per ounce of $587 on a by-product basis.� This compares to 23,361 ounces (including 1,907 ounces of production that are not included in the total cash cost calculation) at a total cash cost per ounce of $538 on a by-product basis in the first nine months of 2013.� The higher production and higher costs in the 2014 period are due to the reasons outlined above.

Improvements are being made to the carbon columns and the leach pumping system, which are expected to have a positive effect on recoveries.

18



La India � Crushing Circuit Refinements Expected to Enhance Production

The La India mine in Sonora, Mexico, located approximately 70 kilometres from the Company�s Pinos Altos mine, was acquired in November�2011 through the Company�s purchase of Grayd Resources.� Commissioning of the mine commenced ahead of schedule in the third quarter of 2013.� Commercial production at La India was achieved on February�1, 2014.

Approximately 1,190,100 tonnes of ore were stacked on the La India leach pad during the third quarter of 2014. Stacking rates continue to ramp up and averaged approximately 12,936 tpd during the quarter.� Minesite costs per tonne at La India were $10 in the third quarter of 2014.

In the first nine months of 2014, approximately 3,346,500 tonnes of ore were stacked on the La India leach pad, with stacking rates averaging approximately 12,258 tpd.� Minesite costs per tonne at La India were $8 in the first nine months of 2014.

Payable gold production in the third quarter of 2014 was 20,311 ounces at a total cash cost per ounce of $547 on a by-product basis.

For the first nine months of 2014, La India produced 51,820 ounces of gold, including 3,492 ounces of pre-commercial production, at total cash cost per ounce of $483 on a by-product basis.

Operations continue to ramp up with month-over-month increases in production.� Planned modifications to the crushing and stacking circuits were completed during the third quarter.� Commissioning of the fine material crusher bypass system is underway and initial results have been positive.� In addition, the block model has yielded slightly more ore than planned, which has had a positive impact on both production and costs.

Board of Directors

It is with regret that during the quarter, the Company received the resignation of Mr.�Clifford Davis due to health reasons.� Mr.�Davis had been a director since 2008.� �Cliff was a valued and active member of our Board of Directors, most recently serving as chair of the Health, Safety, Environment and Sustainable Development Committee.� We will miss Cliff�s knowledge, expertise, and contributions and we wish him well�, said Mr.�James D. Nasso, Chairman of the Board.

Dividend Reinvestment Program

Please follow the link below for information on the Company�s dividend reinvestment program.

Dividend Reinvestment Plan

19



About Agnico Eagle

Agnico Eagle is a senior Canadian gold mining company that has produced precious metals since 1957.� Its nine mines are located in Canada, Finland and Mexico, with exploration and development activities in each of these regions as well as in the United States. The Company and its shareholders have full exposure to gold prices due to its long-standing policy of no forward gold sales. Agnico Eagle has declared a cash dividend every year since 1983.

Further Information

For further information regarding Agnico Eagle, contact Investor Relations at [email protected] or call (416) 947-1212.

Note Regarding Certain Measures of Performance

This news release discloses certain measures, including ��total cash costs per ounce�� and ��minesite costs per tonne�� that are not recognized measures under IFRS. This data may not be comparable to data presented by other gold producers. For a reconciliation of these measures to the most directly comparable financial information presented in the consolidated financial statements prepared in accordance with IFRS and for an explanation of how management uses these measures, see �Reconciliation of Non-GAAP Financial Performance Measures� below.� Total cash costs per ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product metal revenues). Total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the consolidated statements of income (loss) for by-product revenues, unsold concentrate inventory production costs, smelting, refining and marketing charges and other adjustments, and then dividing by the number of ounces of gold produced. Total cash costs per ounce of gold produced on a co-product basis is calculated in the same manner as total cash costs per ounce of gold produced on a by-product basis except that no adjustment for by-product metal revenues is made. Accordingly, the calculation of total cash costs per ounce of gold produced on a co-product basis does not reflect a reduction in production costs or smelting, refining and marketing charges associated with the production and sale of by-product metals. Total cash costs per ounce of gold produced is intended to provide information about the cash generating capabilities of the Company�s mining operations. Management also uses these measures to monitor the performance of the Company�s mining operations. As market prices for gold are quoted on a per ounce basis, using the total cash cost per ounce of gold produced on a by-product basis measure allows management to assess a mine�s cash generating capabilities at various gold prices. Management is aware that these per ounce measures of performance can be affected by fluctuations in and exchange rates, and in the case of total cash costs per ounce of gold produced on a by-product basis, by-product metal prices.� Management compensates for these inherent limitations by using these measures in conjunction with minesite costs per tonne (discussed below) as well as other data prepared in accordance with IFRS. Management also performs sensitivity analyses in order to quantify the effects of fluctuating exchange

20



rates and metal prices.� This news release also contains information as to estimated future total cash costs per ounce, all-in sustaining costs and minesite costs per tonne. The estimates are based upon the total cash costs per ounce, all-in sustaining costs and minesite costs per tonne that the Company expects to incur to mine gold at its mines and projects and, consistent with the reconciliation of these actual costs referred to above, do not include production costs attributable to accretion expense and other asset retirement costs, which will vary over time as each project is developed and mined. It is therefore not practicable to reconcile these forward-looking Non-GAAP financial measures to the most comparable IFRS measure.

The scientific and technical information contained in this news release relating to Northern Business operations has been approved by Christian Provencher,�Ing., Vice-President, Canada and a �Qualified Person� for the purposes of The Canadian Securities Administrators� National Instrument 43-101 (�NI 43-101�).� The scientific and technical information contained in this news release relating to Southern Business operations has been approved by Tim Haldane, P.Eng., Senior Vice-President, Operations � USA and Latin America and a �Qualified Person� for the purposes of NI 43-101.� The scientific and technical information contained in this news release relating to exploration has been approved by Alain Blackburn,�Ing., Senior Vice-President, Exploration and a �Qualified Person� for the purposes of NI 43-101.

Forward-Looking Statements

The information in this news release has been prepared as at October�29, 2014. Certain statements contained in this document constitute �forward-looking statements� within the meaning of the United States Private Securities Litigation Reform Act of 1995 and �forward-looking information� under the provisions of Canadian provincial securities laws and are referred to herein as �forward-looking statements�. When used in this document, the words �anticipate�, �expect�, �estimate�, �forecast�, �will�, �planned� and similar expressions are intended to identify forward-looking statements.� Such statements include without limitation: the Company�s forward-looking production guidance, including estimated ore grades, project timelines, drilling results, metal production, mine estimates horizons, production, total cash costs per ounce, minesite costs per tonne; all-in sustaining costs and cash flows; the estimated timing and conclusions of technical reports and other studies; the methods by which ore will be extracted or processed; statements concerning expansion projects, recovery rates, mill throughput, and projected exploration expenditures, including costs and other estimates upon which such projections are based; estimates of depreciation expense, general and administrative expense and tax rates; the impact of maintenance shutdowns; the estimated timing and receipt of Mexican regulatory approval with respect to the Cayden acquisition; statements regarding timing and amounts of capital expenditures and other assumptions; estimates of future reserves, resources, mineral production, optimization efforts and sales; estimates of mine life; estimates of future mining costs, total cash costs, minesite costs, all-in sustaining costs and other expenses; estimates of future capital expenditures and other cash needs, and expectations as to the funding thereof; statements and information as to the projected development of certain ore deposits, including estimates of exploration, development and production and other capital costs, and estimates of the

21



timing of such exploration, development and production or decisions with respect to such exploration, development and production; estimates of reserves and resources, and statements and information regarding anticipated future exploration; the anticipated timing of events with respect to the Company�s mine sites and statements and information regarding the sufficiency of the Company�s cash resources and other statements and information regarding anticipated trends with respect to the Company�s operations, exploration and the funding thereof. Such statements and information reflect the Company�s views as at the date of this document and are subject to certain risks, uncertainties and assumptions, and undue reliance should not be placed on such statements and information. Forward-looking statements are necessarily based upon a number of factors and assumptions that, while considered reasonable by Agnico Eagle as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The material factors and assumptions used in the preparation of the forward looking statements contained herein, which may prove to be incorrect, include, but are not limited to, the assumptions set forth herein and in management�s discussion and analysis (�MD&A�) and the Company�s Annual Information Form�(�AIF�) for the year ended December�31, 2103 filed with Canadian securities regulators and that are included in its Annual Report on Form�40-F for the year ended December�31, 2013 (�Form�40-F�) filed with the U.S. Securities and Exchange Commission (the �SEC�) as well as: that there are no significant disruptions affecting operations; that production, permitting and expansion at each of Agnico Eagle�s properties proceeds on a basis consistent with current expectations and plans; that the relevant metals prices, exchange rates and prices for key mining and construction supplies will be consistent with Agnico Eagle�s expectations; that Agnico Eagle�s current estimates of mineral reserves, mineral resources, mineral grades and metal recovery are accurate; that there are no material delays in the timing for completion of ongoing growth projects; that the Company�s current plans to optimize production are successful; and that there are no material variations in the current tax and regulatory environment. Many factors, known and unknown could cause the actual results to be materially different from those expressed or implied by such forward looking statements and information. Such risks include, but are not limited to: the volatility of prices of gold and other metals; uncertainty of mineral reserves, mineral resources, mineral grades and mineral recovery estimates; uncertainty of future production, capital expenditures, and other costs; currency fluctuations; financing of additional capital requirements; cost of exploration and development programs; mining risks; community protests; risks associated with foreign operations; governmental and environmental regulation; the volatility of the Company�s stock price; and risks associated with the Company�s by-product metal derivative strategies. For a more detailed discussion of such risks and other factors that may affect the Company�s ability to achieve the expectations set forth in the forward-looking statements contained in this document, see the AIF and MD&A filed on SEDAR at www.sedar.com and included in the Form�40-F filed on EDGAR at www.sec.gov, as well as the Company�s other filings with the Canadian securities regulators and the SEC. The Company does not intend, and does not assume any obligation, to update these forward-looking statements and information. For a detailed breakdown of the Company�s reserve and resource position see the AIF or Form�40-F.

22



AGNICO EAGLE MINES LIMITED

SUMMARY OF OPERATIONS KEY PERFORMANCE INDICATORS

(thousands of United�States dollars, except where noted)

(Unaudited)

Three�Months�Ended

Nine�Months�Ended

September�30,

September�30,

2014

2013

2014

2013

Operating margin(i)�by mine:

Northern Business

LaRonde mine

$

14,696

$

25,461

$

86,523

$

74,015

Lapa mine

13,748

15,303

38,140

53,654

Goldex mine(ii)

17,237

40,045

Meadowbank mine

52,504

90,658

265,193

192,240

Canadian Malartic mine(iii)

33,224

36,892

Kittila mine

12,128

39,150

45,315

83,863

Southern Business

Pinos Altos mine

28,837

40,529

101,318

148,020

Creston Mascota deposit at Pinos Altos

8,032

10,445

23,173

13,787

La India mine(iv)

13,189

39,835

Total operating margin(i)

193,595

221,546

676,434

565,579

Amortization of property, plant and mine�development

117,396

79,266

294,533

223,102

Exploration, corporate and other

69,884

53,725

195,051

200,389

Income (loss) before income and mining taxes

6,315

88,555

186,850

142,088

Income and mining taxes expense

21,365

13,637

82,597

48,521

Net income (loss) for the period

$

(15,050

)

$

74,918

$

104,253

$

93,567

Net income (loss) per share�� basic (US$)

$

(0.07

)

$

0.43

$

0.55

$

0.54

Net income (loss) per share�� diluted (US$)

$

(0.07

)

$

0.43

$

0.55

$

0.54

Cash flows:

Cash provided by operating activities

$

71,244

$

88,365

$

504,368

$

340,254

Cash used in investing activities

$

(131,662

)

$

(153,012

)

$

(728,493

)

$

(543,292

)

Cash provided by (used in) financing activities

$

(35,943

)

$

68,745

$

247,921

$

17,918

Realized prices (US$):

Gold (per�ounce)

$

1,249

$

1,333

$

1,284

$

1,418

Silver (per�ounce)

$

17.72

$

21.84

$

19.33

$

23.11

Zinc (per�tonne)

$

2,365

$

1,874

$

2,227

$

1,891

Copper (per�tonne)

$

7,500

$

7,330

$

6,842

$

7,122

Payable production(v):

Gold (ounces):

Northern Business

LaRonde mine

37,490

45,253

145,336

130,445

Lapa mine

24,781

24,361

67,011

74,407

Goldex mine(ii)

27,611

1,505

70,970

1,505

Meadowbank mine

91,557

133,489

366,162

307,180

Canadian Malartic mine(iii)

64,761

76,639

Kittila mine

28,230

56,177

98,612

104,711

Southern Business

Pinos Altos mine

41,155

43,736

130,350

135,283

Creston Mascota deposit at Pinos Altos

13,377

11,307

34,853

23,361

La India mine(iv)

20,311

51,820

Total gold (ounces)

349,273

315,828

1,041,753

776,892

Silver (thousands of ounces):

Northern Business

LaRonde mine

224

571

918

1,606

Meadowbank mine

34

26

85

71

Canadian Malartic mine(iii)

66

76

Kittila mine

1

2

4

4

Southern Business

Pinos Altos mine

425

600

1,307

1,818

Creston Mascota deposit at Pinos Altos

26

14

60

31

La India mine(iv)

44

111

Total Silver (thousands of ounces)

820

1,213

2,561

3,530

Zinc (tonnes)

2,230

3,648

8,083

15,342

Copper (tonnes)

989

1,241

3,601

3,603

23



Payable metal sold:

Gold (ounces):

Northern Business

LaRonde mine

39,279

47,185

145,494

133,726

Lapa mine

22,422

24,306

64,035

73,889

Goldex mine(ii)

26,762

68,624

Meadowbank mine

98,604

132,010

364,282

299,820

Canadian Malartic mine(iii)

60,093

76,470

Kittila mine

28,209

48,027

97,157

105,119

Southern Business

Pinos Altos mine

41,143

44,554

131,011

137,847

Creston Mascota deposit at Pinos Altos

12,793

12,761

33,758

21,460

La India mine(iv)

19,265

48,922

Total gold (ounces)

348,570

308,843

1,029,753

771,862

Silver (thousands of ounces):

Northern Business

LaRonde mine

249

584

911

1654

Meadowbank mine

32

26

84

71

Canadian Malartic mine(iii)

57

72

Kittila mine

1

1

4

4

Southern Business

Pinos Altos mine

430

588

1367

1814

Creston Mascota deposit at Pinos Altos

18

16

50

30

La India mine(iv)

42

102

Total Silver (thousands of ounces):

829

1,215

2,590

3,573

Zinc (tonnes)

3,936

3,030

8,067

15,309

Copper (tonnes)

988

1,253

3,604

3,611

Total cash costs per ounce of gold produced - Co-product basis (US$)(vi):

Northern Business

LaRonde mine

$

1,316

$

1,470

$

1,118

$

1,526

Lapa mine

606

686

689

696

Goldex mine(ii)

582

661

Meadowbank mine

783

614

566

767

Canadian Malartic mine(iii)

754

737

Kittila mine(vii)

952

518

862

565

Southern Business

Pinos Altos mine

724

699

706

651

Creston Mascota deposit at Pinos Altos(viii)

589

572

620

562

La India mine(iv)

584

528

Weighted average total cash costs per ounce of gold produced

$

794

$

733

$

716

$

832

Total cash costs per ounce of gold produced - By-product basis (US$)(vi):

Northern Business

LaRonde mine

$

861

$

772

$

701

$

812

Lapa mine

606

686

689

696

Goldex mine(ii)

582

661

Meadowbank mine

777

610

561

761

Canadian Malartic mine(iii)

735

717

Kittila mine(vii)

951

518

861

564

Southern Business

Pinos Altos mine

545

396

513

348

Creston Mascota deposit at Pinos Altos(viii)

556

545

587

538

La India mine(iv)

547

483

Weighted average total cash costs per ounce of gold produced

$

716

$

591

$

627

$

659

24




Notes:

(i)���������������������������������� Operating margin is calculated as revenues from mining operations less production costs.

(ii)������������������������������� The Goldex mine�s M and E Zones achieved commercial production on October�1,�2013.

(iii)���������������������������� On June�16, 2014, the Company and Yamana Gold Inc. (�Yamana�) completed the joint acquisition of 100.0% of the issued and outstanding common shares of Osisko Mining Corporation by way of a court-approved plan of arrangement (the �Arrangement�).� As a result of the Arrangement, Agnico Eagle and Yamana each own 50.0% of Canadian Malartic General Partnership (�CMGP�), which operates the Canadian Malartic mine, and have formed a joint committee to manage its operations.� The information set out in this table reflects the Company�s 50.0% interest in the Canadian Malartic mine.

(iv)����������������������������� The La India mine achieved commercial production on February�1, 2014. 3,492�ounces of payable gold production were excluded from the calculation of total cash costs per ounce of gold produced in the first quarter of 2014 as they were produced prior to the achievement of commercial production.

(v)�������������������������������� Payable production is the quantity of mineral produced during a period contained in products that are or will be sold by the Company, whether such products are sold during the period or held as inventory at the end of the�period.

(vi)����������������������������� Total cash costs per ounce of gold produced is not a recognized measure under IFRS and this data may not be comparable to data presented by other gold producers. Total cash costs per ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product metal revenues). Total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the interim unaudited consolidated statements of income (loss) and comprehensive income (loss) for by-product metal revenues, unsold concentrate inventory production costs, smelting, refining and marketing charges and other adjustments, and then dividing by the number of ounces of gold produced. Total cash costs per ounce of gold produced on a co-product basis is calculated in the same manner as total cash costs per ounce of gold produced on a by-product basis except that no adjustment for by-product metal revenues is made. The calculation of total cash costs per ounce of gold produced on a co-product basis does not reflect a reduction in production costs or smelting, refining and marketing charges associated with the production and sale of by-product metals. The Company believes that these generally accepted industry measures provide a realistic indication of operating performance and provide useful comparison points between periods. Total cash costs per ounce of gold produced is intended to provide information about the cash generating capabilities of the Company�s mining operations. Management also uses these measures to monitor the performance of the Company�s mining operations. As market prices for gold are quoted on a per ounce basis, using the total cash costs per ounce of gold produced on a by-product basis measure allows management to assess a mine�s cash generating capabilities at various gold prices. Management is aware that these per ounce measures of performance can be affected by fluctuations in exchange rates and, in the case of total cash costs per ounce of gold produced on a by-product basis, by-product metal prices. Management compensates for these inherent limitations by using these measures in conjunction with minesite costs per tonne as well as other data prepared in accordance with IFRS. Management also performs sensitivity analyses in order to quantify the effects of fluctuating metal prices and exchange rates.

(vii)������������������������ Excludes the Kittila mine�s results for the second quarter of 2013. Due to scheduled maintenance, the Kittila mine only operated for 14�days during the second quarter of�2013.� The Kittila mine incurred $18,159 in production costs during the second quarter of 2013, which were excluded from the calculation of total cash costs per ounce of gold produced and minesite costs per tonne.

(viii)��������������������� Excludes the Creston Mascota deposit at Pinos Altos� results for the first quarter of 2013 due to the temporary suspension of active leaching between October�1, 2012 and March�13, 2013 due to an unexpected movement of leached ore at the Phase One leach pad.� The Creston Mascota deposit at Pinos Altos incurred $3,117 in production costs during the first quarter of 2013, which were excluded from total cash costs per ounce of gold produced.

25



AGNICO EAGLE MINES LIMITED

CONSOLIDATED BALANCE SHEETS

(thousands of United States dollars, except share amounts,�IFRS basis)

(Unaudited)

As�at
September�30,

As�at
December�31,

2014

2013

ASSETS

Current assets

Cash and cash equivalents

$

158,823

$

139,101

Short-term investments

6,821

2,217

Restricted cash

22,057

28,723

Trade receivables

61,728

67,300

Inventories

452,335

345,083

Income taxes recoverable

1,540

18,682

Available-for-sale securities

64,725

74,581

Fair value of derivative financial instruments

3,227

5,590

Other current assets

130,176

116,992

Total current assets

901,432

798,269

Non-current assets

Restricted cash

33,189

Goodwill

638,393

39,017

Property, plant and mine development

5,057,099

3,694,461

Other assets

44,756

48,334

Total assets

$

6,674,869

$

4,580,081

LIABILITIES AND EQUITY

Current liabilities

Accounts payable and accrued liabilities

$

224,048

$

173,374

Reclamation provision

2,798

3,452

Interest payable

21,095

13,803

Income taxes payable

15,369

7,523

Capital lease obligations

22,308

12,035

Current portion of long-term debt

18,933

Fair value of derivative financial instruments

535

323

Total current liabilities

305,086

210,510

Non-current liabilities

Long-term debt

1,359,549

987,356

Reclamation provision

241,641

184,009

Deferred income and mining tax liabilities

756,310

453,411

Other liabilities

42,515

27,389

Total liabilities

2,705,101

1,862,675

EQUITY

Common shares:

Outstanding - 210,091,009 common shares issued, less 1,060,386 shares held in trust

4,469,249

3,294,007

Stock options

197,291

184,078

Contributed surplus

37,254

37,254

Deficit

(740,445

)

(800,074

)

Accumulated other comprehensive income

6,419

2,141

Total equity

3,969,768

2,717,406

Total liabilities and equity

$

6,674,869

$

4,580,081

26



AGNICO EAGLE MINES LIMITED

CONSOLIDATED STATEMENTS OF INCOME (LOSS)

(thousands of United States dollars, except per share amounts,�IFRS basis)

(Unaudited)

Three�Months�Ended
September�30,

Nine�Months�Ended
September�30,

2014

2013

2014

2013

REVENUES

Revenues from mining operations

$

463,388

$

444,320

$

1,393,676

$

1,201,166

COSTS, EXPENSES AND OTHER INCOME

Production (i)

269,793

222,774

717,242

635,587

Exploration and corporate development

20,521

15,550

41,566

35,447

Amortization of property, plant and mine development

117,396

79,266

294,533

223,102

General and administrative

24,991

23,997

92,776

87,868

Impairment loss on available-for-sale securities

462

299

2,881

28,607

Finance costs

20,852

15,954

55,249

45,698

Loss (gain) on derivative financial instruments

7,908

(4,457

)

3,644

(2,733

)

Gain on sale of available-for-sale securities

(83

)

(5,372

)

Environmental remediation

8,490

9,163

Foreign currency translation (gain) loss

(4,679

)

2,548

(3,170

)

3,161

Other (income) expenses

(8,578

)

(166

)

(1,686

)

2,341

Income before income and mining taxes

6,315

88,555

186,850

142,088

Income and mining taxes expense

21,365

13,637

82,597

48,521

Net income (loss) for the period

$

(15,050

)

$

74,918

$

104,253

$

93,567

Net income (loss) per share - basic

$

(0.07

)

$

0.43

$

0.55

$

0.54

Net income (loss) per share - diluted

$

(0.07

)

$

0.43

$

0.55

$

0.54

Weighted average number of common shares outstanding (in�thousands):

Basic

208,815

173,102

189,498

172,652

Diluted

208,815

173,452

190,139

173,032


Note:

(i)������������ Exclusive of amortization, which is shown separately.

27



AGNICO EAGLE MINES LIMITED

CONSOLIDATED STATEMENTS OF CASH FLOWS

(thousands of United States dollars,�IFRS basis)

(Unaudited)

Three�Months�Ended
September�30,

Nine�Months�Ended
September�30,

2014

2013

2014

2013

OPERATING ACTIVITIES

Net income (loss) for the period

$

(15,050

)

$

74,918

$

104,253

$

93,567

Add (deduct) items not affecting cash:

Amortization of property, plant and mine development

117,396

79,266

294,533

223,102

Deferred income and mining taxes

6,982

12,762

26,189

28,441

Gain on sale of available-for-sale securities

(83

)

(5,372

)

Stock-based compensation

7,552

10,153

30,032

35,619

Impairment loss on available-for-sale securities

462

299

2,881

28,607

Foreign currency translation (gain) loss

(4,679

)

2,548

(3,170

)

3,161

Other

19,065

(1,050

)

26,971

11,054

Adjustment for settlement of environmental remediation

(2,456

)

(2,845

)

(3,491

)

(8,387

)

Changes in non-cash working capital balances:

Trade receivables

6,972

(4,170

)

15,225

3,579

Income taxes

4,468

(8,236

)

24,988

(16,343

)

Inventories

(54,962

)

(76,932

)

(25,059

)

(55,682

)

Other current assets

4,490

(29,081

)

(315

)

(49,937

)

Accounts payable and accrued liabilities

(26,046

)

23,464

9,710

37,645

Interest payable

7,133

7,269

6,993

5,828

Cash provided by operating activities

71,244

88,365

504,368

340,254

INVESTING ACTIVITIES

Additions to property, plant and mine development

(125,442

)

(149,670

)

(342,059

)

(482,596

)

Acquisition of Osisko Mining Corporation, net

(403,509

)

Acquisition of Urastar Gold Corporation, net

(10,051

)

Net (purchases) sales of short-term investments

(2,600

)

2,711

(4,604

)

6,323

Net proceeds from sale of available-for-sale securities

493

40,635

Purchase of available-for-sale securities and warrants

(13,861

)

(2,769

)

(27,246

)

(55,028

)

Decrease (increase) in restricted cash

9,748

(3,284

)

8,290

(1,940

)

Cash used in investing activities

(131,662

)

(153,012

)

(728,493

)

(543,292

)

FINANCING ACTIVITIES

Dividends paid

(14,546

)

(32,618

)

(39,459

)

(94,267

)

Repayment of capital lease obligations

(7,672

)

(2,582

)

(14,366

)

(8,644

)

Sale-leaseback financing

1,027

Proceeds from long-term debt

230,000

150,000

960,000

240,000

Repayment of long-term debt

(250,707

)

(50,000

)

(674,640

)

(120,000

)

Long-term debt financing

(2,127

)

(2,127

)

Repurchase of common shares for restricted share unit plan

(7,518

)

(19,000

)

Proceeds on exercise of stock options

6,538

16,994

8,006

Common shares issued

2,571

3,945

8,010

11,823

Cash (used in) provided by financing activities

(35,943

)

68,745

247,921

17,918

Effect of exchange rate changes on cash and cash equivalents

(4,385

)

634

(4,074

)

(837

)

Net (decrease) increase in cash and cash equivalents during the period

(100,746

)

4,732

19,722

(185,957

)

Cash and cash equivalents, beginning of period

259,569

107,379

139,101

298,068

Cash and cash equivalents, end of period

$

158,823

$

112,111

$

158,823

$

112,111

SUPPLEMENTAL CASH FLOW INFORMATION

Interest paid

$

13,149

$

7,344

$

43,969

$

35,891

Income and mining taxes paid

$

16,911

$

8,983

$

38,232

$

39,983

28



AGNICO EAGLE MINES LIMITED

RECONCILIATION OF NON-GAAP FINANCIAL PERFORMANCE MEASURES

(Unaudited)

Total Production Costs by Mine

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs per the interim unaudited consolidated statements of income

$

269,793

$

222,774

$

717,242

$

635,587

LaRonde mine

47,070

57,939

141,107

175,579

Lapa mine

13,887

17,219

43,593

52,004

Goldex mine(i)

16,222

47,486

Meadowbank mine

72,838

84,858

203,725

235,885

Canadian Malartic mine (ii)

47,882

66,215

Kittila mine (iii)

23,963

25,283

80,347

52,347

Pinos Altos mine

29,293

30,499

90,652

86,917

Creston Mascota deposit at Pinos Altos(iv)

7,644

6,976

20,278

11,346

La India mine(v)

10,994

23,839

Total

$

269,793

$

222,774

$

717,242

$

614,078

Reconciliation of Production Costs to Total Cash Costs per Ounce of Gold Produced (vi)�by Mine

LaRonde Mine - Total Cash Costs per Ounce of Gold Produced (vi)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

47,070

$

57,939

$

141,107

$

175,579

Adjustments:

Inventory and other adjustments(vii)

2,273

8,601

21,437

23,486

Cash operating costs (co-product basis)

$

49,343

$

66,540

$

162,544

$

199,065

By-product metal revenues

(17,078

)

(31,595

)

(60,722

)

(93,132

)

Cash operating costs (by-product basis)

$

32,265

$

34,945

$

101,822

$

105,933

Gold production (ounces)

37,490

45,253

145,336

130,445

Total cash costs per ounce of gold produced ($�per ounce)(vi):

Co-product basis

$

1,316

$

1,470

$

1,118

$

1,526

By-product basis

$

861

$

772

$

701

$

812

Lapa Mine - Total Cash Costs per Ounce of Gold Produced (vi)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

13,887

$

17,219

$

43,593

$

52,004

Adjustments:

Inventory and other adjustments(vii)

1,141

(514

)

2,608

(208

)

Cash operating costs (co-product basis)

$

15,028

$

16,705

$

46,201

$

51,796

By-product metal revenues

(3

)

(2

)

(6

)

(20

)

Cash operating costs (by-product basis)

$

15,025

$

16,703

$

46,195

$

51,776

Gold production (ounces)

24,781

24,361

67,011

74,407

Total cash costs per ounce of gold produced ($�per ounce)(vi):

Co-product basis

$

606

$

686

$

689

$

696

By-product basis

$

606

$

686

$

689

$

696

Goldex Mine - Total Cash Costs per Ounce of Gold Produced (i)(vi)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

16,222

$

$

47,486

$

Adjustments:

Inventory and other adjustments(vii)

(147

)

(559

)

Cash operating costs (co-product basis)

$

16,075

$

$

46,927

$

By-product metal revenues

(5

)

(16

)

Cash operating costs (by-product basis)

$

16,070

$

$

46,911

$

Gold production (ounces)

27,611

70,970

Total cash costs per ounce of gold produced ($�per ounce)(vi):

Co-product basis

$

582

$

$

661

$

By-product basis

$

582

$

$

661

$

Meadowbank Mine - Total Cash Costs per Ounce of Gold Produced (vi)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

72,838

$

84,858

$

203,725

$

235,885

Adjustments:

Inventory and other adjustments(vii)

(1,136

)

(2,884

)

3,344

(267

)

Cash operating costs (co-product basis)

$

71,702

$

81,974

$

207,069

$

235,618

By-product metal revenues

(570

)

(559

)

(1,615

)

(1,751

)

Cash operating costs (by-product basis)

$

71,132

$

81,415

$

205,454

$

233,867

Gold production (ounces)

91,557

133,489

366,162

307,180

Total cash costs per ounce of gold produced ($�per ounce)(vi):

Co-product basis

$

783

$

614

$

566

$

767

By-product basis

$

777

$

610

$

561

$

761

29



Canadian Malartic Mine - Total Cash Costs per Ounce of Gold Produced (ii)(vi)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

47,882

$

$

66,215

$

Adjustments:

Inventory and other adjustments(vii)�(viii)

935

(9,762

)

Cash operating costs (co-product basis)

$

48,817

$

$

56,453

$

By-product metal revenues

(1,213

)

(1,541

)

Cash operating costs (by-product basis)

$

47,604

$

$

54,912

$

Gold production (ounces)

64,761

76,639

Total cash costs per ounce of gold produced ($�per ounce)(vi):

Co-product basis

$

754

$

$

737

$

By-product basis

$

735

$

$

717

$

Kittila Mine - Total Cash Costs per Ounce of Gold Produced (iii)(vi)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

23,963

$

25,283

$

80,347

$

52,347

Adjustments:

Inventory and other adjustments(vii)

2,915

3,832

4,677

3,726

Cash operating costs (co-product basis)

$

26,878

$

29,115

$

85,024

$

56,073

By-product metal revenues

(26

)

(9

)

(87

)

(41

)

Cash operating costs (by-product basis)

$

26,852

$

29,106

$

84,937

$

56,032

Gold production (ounces)

28,230

56,177

98,612

99,322

Total cash costs per ounce of gold produced ($�per�ounce)(vi):

Co-product basis

$

952

$

518

$

862

$

565

By-product basis

$

951

$

518

$

861

$

564

Pinos Altos Mine - Total Cash Costs per Ounce of Gold Produced (vi)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

29,293

$

30,499

$

90,652

$

86,917

Adjustments:

Inventory and other adjustments(vii)

485

80

1,395

1,119

Cash operating costs (co-product basis)

$

29,778

$

30,579

$

92,047

$

88,036

By-product metal revenues

(7,344

)

(13,260

)

(25,229

)

(40,954

)

Cash operating costs (by-product basis)

$

22,434

$

17,319

$

66,818

$

47,082

Gold production (ounces)

41,155

43,736

130,350

135,283

Total cash costs per ounce of gold produced ($�per�ounce)(vi):

Co-product basis

$

724

$

699

$

706

$

651

By-product basis

$

545

$

396

$

513

$

348

Creston Mascota deposit at Pinos Altos - Total Cash Costs per Ounce of Gold Produced (iv)(vi)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

7,644

$

6,976

$

20,278

$

11,346

Adjustments:

Inventory and other adjustments(vii)

233

(510

)

1,317

706

Cash operating costs (co-product basis)

$

7,877

$

6,466

$

21,595

$

12,052

By-product metal revenues

(442

)

(308

)

(1,152

)

(515

)

Cash operating costs (by-product basis)

$

7,435

$

6,158

$

20,443

$

11,537

Gold production (ounces)

13,377

11,307

34,853

21,454

Total cash costs per ounce of gold produced ($�per�ounce)(vi):

Co-product basis

$

589

$

572

$

620

$

562

By-product basis

$

556

$

545

$

587

$

538

La India Mine - Total Cash Costs per Ounce of Gold Produced (v)(vi)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

10,994

$

$

23,839

$

Adjustments:

Inventory and other adjustments(vii)

869

1,685

Cash operating costs (co-product basis)

$

11,863

$

$

25,524

$

By-product metal revenues

(746

)

(2,175

)

Cash operating costs (by-product basis)

$

11,117

$

$

23,349

$

Gold production (ounces)

20,311

48,327

Total cash costs per ounce of gold produced ($�per�ounce)(vi):

Co-product basis

$

584

$

$

528

$

By-product basis

$

547

$

$

483

$

Reconciliation of Production Costs to Minesite Costs per Tonne(ix)�by Mine

LaRonde Mine - Minesite Costs per Tonne(ix)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

47,070

$

57,939

$

141,107

$

175,579

Inventory adjustment(x)

(3,488

)

(1,666

)

326

(5,772

)

Minesite operating costs

$

43,582

$

56,273

$

141,433

$

169,807

Minesite operating costs (thousands of C$)

C$

47,474

C$

58,438

C$

154,785

C$

173,810

Tonnes of ore milled (thousands of tonnes)

426

547

1,547

1,700

Minesite costs per tonne (C$)(ix)

C$

111

C$

107

C$

100

C$

102

30



Lapa Mine - Minesite Costs per Tonne(ix)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

13,887

$

17,219

$

43,593

$

52,004

Inventory adjustment(x)

1,086

(547

)

2,544

(310

)

Minesite operating costs

$

14,973

$

16,672

$

46,137

$

51,694

Minesite operating costs (thousands of C$)

C$

16,310

C$

17,314

C$

50,492

C$

52,913

Tonnes of ore milled (thousands of tonnes)

157

154

477

473

Minesite costs per tonne (C$)(ix)

C$

104

C$

112

C$

106

C$

112

Goldex Mine - Minesite Costs per Tonne(i)(ix)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

16,222

$

$

47,486

$

Inventory adjustment(x)

(175

)

(507

)

Minesite operating costs

$

16,047

$

$

46,979

$

Minesite operating costs (thousands of C$)

C$

17,481

C$

C$

51,414

C$

Tonnes of ore milled (thousands of tonnes)

538

1,542

Minesite costs per tonne (C$)(ix)

C$

32

C$

C$

33

C$

Meadowbank Mine - Minesite Costs per Tonne(ix)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

72,838

$

84,858

$

203,725

$

235,885

Inventory adjustment(x)

(1,224

)

(3,120

)

3,716

(990

)

Minesite operating costs

$

71,614

$

81,738

$

207,441

$

234,895

Minesite operating costs (thousands of C$)

C$

78,009

C$

84,880

C$

227,023

C$

240,596

Tonnes of ore milled (thousands of tonnes)

1,057

1,047

3,102

3,095

Minesite costs per tonne (C$)(ix)

C$

74

C$

81

C$

73

C$

78

Canadian Malartic Mine - Minesite Costs per Tonne (ii)(ix)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

47,882

$

$

66,215

$

Inventory adjustment(viii)(x)

719

(10,029

)

Minesite operating costs

$

48,601

$

$

56,186

$

Minesite operating costs (thousands of C$)

C$

52,942

C$

C$

61,491

C$

Tonnes of ore milled (thousands of tonnes)

2,417

2,815

Minesite costs per tonne (C$)(ix)

C$

22

C$

C$

22

C$

Kittila Mine - Minesite Costs per Tonne(iii)(ix)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

23,963

$

25,283

$

80,347

$

52,347

Inventory adjustment(x)

2,817

3,759

4,313

3,465

Minesite operating costs

$

26,780

$

29,042

$

84,660

$

55,812

Minesite operating costs (thousands of �)

20,217

21,893

62,488

42,473

Tonnes of ore milled (thousands of tonnes)

235

307

790

574

Minesite costs per tonne (�)(ix)

86

71

79

74

Pinos Altos Mine - Minesite Costs per Tonne(ix)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

29,293

$

30,499

$

90,652

$

86,917

Inventory adjustment(x)

96

(987

)

(1

)

(1,493

)

Minesite operating costs

$

29,389

$

29,512

$

90,651

$

85,424

Tonnes of ore processed (thousands of tonnes)

607

661

1,887

2,052

Minesite costs per tonne (US$)(ix)

$

48

$

45

$

48

$

42

Creston Mascota deposit at Pinos Altos - Minesite Costs per Tonne(iv)(ix)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

7,644

$

6,976

$

20,278

$

11,346

Inventory adjustment(x)

115

(605

)

1,033

541

Minesite operating costs

$

7,759

$

6,371

$

21,311

$

11,887

Tonnes of ore processed (thousands of tonnes)

469

335

1,243

698

Minesite costs per tonne (US$)(ix)

$

17

$

19

$

17

$

17

La India Mine - Minesite Costs per Tonne(v)(ix)

Three�Months�Ended

Three�Months�Ended

Nine�Months�Ended

Nine�Months�Ended

(thousands�of�United�States�dollars,�except�as�noted)

September�30,�2014

September�30,�2013

September�30,�2014

September�30,�2013

Production costs

$

10,994

$

$

23,839

$

Inventory adjustment(x)

851

1,430

Minesite operating costs

$

11,845

$

$

25,269

$

Tonnes of ore processed (thousands of tonnes)

1,190

3,015

Minesite costs per tonne (US$)(ix)

$

10

$

$

8

$

31




Notes:

(i)���������������������� The Goldex mine�s M and E Zones achieved commercial production on October�1, 2013.

(ii)������������������� On June�16, 2014, the Company and Yamana Gold Inc. (�Yamana�) completed the joint acquisition of 100.0% of the issued and outstanding common shares of Osisko Mining Corporation by way of a court-approved plan of arrangement (the �Arrangement�).� As a result of the Arrangement, Agnico Eagle and Yamana each own 50.0% of Canadian Malartic General Partnership (�CMGP�), which operates the Canadian Malartic mine, and have formed a joint committee to manage its operations.� The information set out in this table reflects the Company�s 50.0% interest in the Canadian Malartic mine.

(iii)���������������� Excludes the Kittila mine�s results for the second quarter of 2013. Due to an extended maintenance shutdown, the Kittila mine only operated for 14 days during the second quarter of 2013. The Kittila mine incurred $18,159 in production costs during the second quarter of 2013, which were excluded from the calculation of total cash costs per ounce of gold produced and minesite costs per tonne.

(iv)��������������� Excludes the Creston Mascota deposit at Pinos Altos� results for the first quarter of 2013 due to the temporary suspension of active leaching between October�1, 2012 and March�13, 2013.� The Creston Mascota deposit at Pinos Altos incurred $3,117 in production costs during the first quarter of 2013, which were excluded from total cash costs per ounce of gold produced.

(v)������������������ The La India mine achieved commercial production on February�1, 2014. 3,492 ounces of payable gold production were excluded from the calculation of total cash costs per ounce of gold produced in the first quarter of 2014 as they were produced prior to the achievement of commercial production.

(vi)��������������� Total cash costs per ounce of gold produced is not a recognized measure under IFRS and this data may not be comparable to data presented by other gold producers. Total cash costs per ounce of gold produced is presented on both a by-product basis (deducting by-product metal revenues from production costs) and co-product basis (before by-product metal revenues). Total cash costs per ounce of gold produced on a by-product basis is calculated by adjusting production costs as recorded in the interim unaudited consolidated statement of income (loss) for by-product metal revenues, unsold concentrate inventory production costs, smelting, refining and marketing charges and other adjustments, and then dividing by the number of ounces of gold produced. Total cash costs per ounce of gold produced on a co-product basis is calculated in the same manner as total cash costs per ounce of gold produced on a by-product basis except that no adjustment for by-product metal revenues is made. Accordingly, the calculation of total cash costs per ounce of gold produced on a co-product basis does not reflect a reduction in production costs or smelting, refining and marketing charges associated with the production and sale of by-product metals.� The Company believes that these generally accepted industry measures provide a realistic indication of operating performance and provide useful comparison points between periods. Total cash costs per ounce of gold produced is intended to provide information about the cash generating capabilities of the Company�s mining operations. Management also uses these measures to monitor the performance of the Company�s mining operations. As market prices for gold are quoted on a per ounce basis, using the total cash costs per ounce of gold produced on a by-product basis measure allows management to assess a mine�s cash generating capabilities at various gold prices. Management is aware that these per ounce measures of performance can be affected by fluctuations in exchange rates and, in the case of total cash costs of gold produced on a by-product basis, by-product metal prices. Management compensates for these inherent limitations by using these measures in conjunction with minesite costs per tonne (discussed below) as well as other data prepared in accordance with IFRS. Management also performs sensitivity analyses in order to quantify the effects of fluctuating metal prices and exchange rates.

(vii)������������ Under the Company�s revenue recognition policy, revenue is recognized on concentrates when legal title passes. As total cash costs per ounce of gold produced are calculated on a production basis, an inventory adjustment is made to reflect the sales margin on the portion of concentrate production not yet recognized as�revenue.� Other adjustments include the addition of smelting, refining and marketing charges to production costs.

(viii)��������� For the second quarter of 2014 the Canadian Malartic inventory adjustment includes a fair value increment on finished goods inventory related to the purchase price allocation as part of the acquisition of the Canadian Malartic assets.

(ix)��������������� Minesite costs per tonne is not a recognized measure under IFRS and this data may not be comparable to data presented by other gold producers. This measure is calculated by adjusting production costs as shown in the interim unaudited consolidated statement of income (loss) for unsold concentrate inventory production costs, and then dividing by tonnes of ore milled. As the total cash costs per ounce of gold produced measure can be impacted by fluctuations in by-product metal prices and exchange rates, management believes that the minesite costs per tonne measure provides additional information regarding the performance of mining operations, eliminating the impact of varying production levels. Management also uses this measure to determine the economic viability of mining blocks. As each mining block is evaluated based on the net realizable value of each tonne mined, in order to be economically viable the estimated revenue on a per tonne basis must be in excess of the minesite costs per tonne. Management is aware that this per tonne measure of performance can be impacted by fluctuations in processing levels and compensates for this inherent limitation by using this measure in conjunction with production costs prepared in accordance with IFRS.

(x)������������������ This inventory adjustment reflects production costs associated with unsold concentrates.

32



AGNICO EAGLE MINES LIMITED

DEPRECIABLE ASSETS BALANCE BY MINE

(Unaudited)

Depreciable�Assets�by�Mine

As�at

(thousands�of�United�States�dollars)

September�30,�2014

LaRonde mine

$

750,365

Lapa mine

65,236

Goldex mine

189,246

Meadowbank mine

363,368

Canadian Malartic mine

1,029,322

Kittila mine

702,510

Pinos Altos mine

409,682

Creston Mascota deposit at Pinos Altos

53,946

La India mine

409,939

Total

$

3,973,614

33




Serious News for Serious Traders! Try StreetInsider.com Premium Free!

You May Also Be Interested In





Related Categories

SEC Filings